2018 Vol. 44 No. 12
2018, 44(12): 1-8.
DOI: 10.13272/j.issn.1671-251x.17377
Abstract: In order to solve problems of large number of workers and high labor intensity on fully mechanized mining face with large mining h...
2018, 44(12): 9-13.
DOI: 10.13272/j.issn.1671-251x.2018040064
Abstract: According to the requirements for underground multi-system fusion of Technology schemes of upgrading of coal mine safety monitorin...
2018, 44(12): 14-18.
DOI: 10.13272/j.issn.1671-251x.2018080065
Abstract: In view of requirements in Technology schemes of upgrading of coal mine safety monitoring and control system, a design scheme of m...
2018, 44(12): 19-23.
DOI: 10.13272/j.issn.1671-251x.17372
Abstract: For rapid and highly efficient requirements of mine emergency handling and rescue, a mine rescuing support system was designed by ...
2018, 44(12): 24-29.
DOI: 10.13272/j.issn.1671-251x.2018030032
Abstract: For problems of single detecting type and limited abilities including data processing and complex function realization of existing...
2018, 44(12): 30-33.
DOI: 10.13272/j.issn.1671-251x.2018050017
Abstract: In view of problem that present mine ventilation system control had not been considered from overall perspective of ventilation sy...
2018, 44(12): 34-38.
DOI: 10.13272/j.issn.1671-251x.2018070016
Abstract: In view of problem that manual trouble shooting method of electro-hydraulic control system of hydraulic support cannot accurately ...
2018, 44(12): 39-42.
DOI: 10.13272/j.issn.1671-251x.17337
Abstract: Aiming at problem that fully mechanized caving face at the back end of fully mechanized top coal caving face adopted manual caving...
2018, 44(12): 43-48.
DOI: 10.13272/j.issn.1671-251x.2018010012
Abstract: In view of problems of serious thermal damage, local high temperature and uneven temperature distribution of long-distance coal fa...
2018, 44(12): 48-53.
DOI: 10.13272/j.issn.1671-251x.17364
Abstract: In view of problems of gas concentration prediction method based on least squares support vector machine (LS-SVM) such as easy to ...
2018, 44(12): 54-60.
DOI: 10.13272/j.issn.1671-251x.2018090054
Abstract: For problems of slow convergence speed and large calculation amount existed in non-linear inversion methods of mine seismic wave v...
2018, 44(12): 60-64.
DOI: 10.13272/j.issn.1671-251x.2018020047
Abstract: In view of the problems of low recognition accuracy, multiple extraction parameters and low real-time processing efficiency of exi...
2018, 44(12): 65-70.
DOI: 10.13272/j.issn.1671-251x.2018040059
Abstract: In view of problems of high switching loss, serious interphase interference and low DC side voltage utilization in tracking compen...
2018, 44(12): 71-77.
DOI: 10.13272/j.issn.1671-251x.2018070061
Abstract: Three asymmetrical faults of singe-phase grounding, singe-phase line breakage and ferroresonance in coal mine power network are ea...
2018, 44(12): 78-82.
DOI: 10.13272/j.issn.1671-251x.17366
Abstract: Aiming at scenario of using wireless charging device to carry out energy transmission for underground wireless rechargeable sensor...
2018, 44(12): 83-88.
DOI: 10.13272/j.issn.1671-251x.17368
Abstract: In order to research influence of coupled seepage field and stress field on slope stability of open-pit mine, ABAQUS finite elemen...
2018, 44(12): 89-93.
DOI: 10.13272/j.issn.1671-251x.17359
Abstract: In view of problems of coal mines under large coal enterprises, such as large number, cross-regional distribution and multiple man...
2018, 44(12): 93-97.
DOI: 10.13272/j.issn.1671-251x.17358
Abstract: Traditional coal mine emergency exercise was restricted by environment with high cost and hidden danger, and existing coal mine em...
2018, 44(12): 97-101.
DOI: 10.13272/j.issn.1671-251x.2018060044
Abstract: For problems of inflexible layout, high cost, difficult maintenance, short communication distance and high power consumption of ex...