WANG Haoyu, CHEN Ying, MIAO Yanzi, CHEN Bingguang. A fault diagnosis system of mine main ventilator[J]. Journal of Mine Automation, 2017, 43(6): 69-71. DOI: 10.13272/j.issn.1671-251x.2017.06.016
Citation: WANG Haoyu, CHEN Ying, MIAO Yanzi, CHEN Bingguang. A fault diagnosis system of mine main ventilator[J]. Journal of Mine Automation, 2017, 43(6): 69-71. DOI: 10.13272/j.issn.1671-251x.2017.06.016

A fault diagnosis system of mine main ventilator

More Information
  • A fault diagnosis model was built by use of neural network trained by extreme learning machine. A fault diagnosis system of mine main ventilator based on the model was designed, and software and hardware design schemes of the system were introduced. The test results show running time of extreme learning machine algorithm in the system is only 0.031 3 s and accuracy rate of fault diagnosis is not less than 97.35%, which has better real-time performance and accuracy than fault diagnosis systems based on BP neural network, ELMAN neural network or neural network trained by support vector machine.
  • Related Articles

    [1]WU Panxin, LIU Peng, SHU Ya, YU Qiankun, DING Enjie. Ontology construction and safety rule reasoning of main types of work in coal mine[J]. Journal of Mine Automation, 2022, 48(1): 64-70. DOI: 10.13272/j.issn.1671-251x.2021080053
    [2]LEI Xuefeng, LIU Weidong, ZHANG Shen. Research of task scheduling of cyber physical system of coal preparation plant[J]. Journal of Mine Automation, 2015, 41(3): 61-65. DOI: 10.13272/j.issn.1671-251x.2015.03.016
    [3]GUO Xin, NING Jian-min. Development of Full-automatic and Intelligent Scheduling and Loading System[J]. Journal of Mine Automation, 2012, 38(9): 9-12.
    [4]YANG Fei-hu, SU Bo-xia. Research of a Combined Model of Power Flow Calculation and Re-scheduling Generation Based on Operational Reliability[J]. Journal of Mine Automation, 2011, 37(12): 48-51.
    [5]DAI Ming-jun, CHENG Can, SHEN Zhong-ze. Application Research of Apriori Algorithm of Association Rules in Production Scheduling Subsystem of Coal Mine[J]. Journal of Mine Automation, 2010, 36(7): 62-64.
    [6]ZHANG Zhi-bin, JIANG Ya-nan, GUO Zheng-hui. Application Research of Data Mining Technology with Association Rules in Early-warning System for Coal Mine Safety[J]. Journal of Mine Automation, 2009, 35(9): 24-26.
    [7]SUN Shi-cui, DING En-jie, XU Xiu. Research of Resource Management and Task Scheduling Based on Mine Safety Grid[J]. Journal of Mine Automation, 2007, 33(6): 1-4.
    [8]GAO Yun, HOU Yuan-bin. Extraction Method of Control Rules Based on Rough Set Theory[J]. Journal of Mine Automation, 2003, 29(4): 12-14.
    [9]LI Zu-xin , ZHANG Yu-feng , SHI Xin-ling . A New P-FUZZY-PID Controller with Switching Based on Fuzzy Rules[J]. Journal of Mine Automation, 2003, 29(1): 4-6.
    [10]CUI Xue-ying. Design of FLP Enclosure for Multi─purpose Combination Switch[J]. Journal of Mine Automation, 1996, 22(3): 47-51.

Catalog

    Article Metrics

    Article views (42) PDF downloads (8) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return