YAN Qinyun, BAI Maiying, ZHANG Hongyan, RUAN Hongxin, WANG Lei. Design of loading process tracing and feedback system of coal storage yard[J]. Journal of Mine Automation, 2016, 42(1): 1-4. DOI: 10.13272/j.issn.1671-251x.2016.01.001
Citation: YAN Qinyun, BAI Maiying, ZHANG Hongyan, RUAN Hongxin, WANG Lei. Design of loading process tracing and feedback system of coal storage yard[J]. Journal of Mine Automation, 2016, 42(1): 1-4. DOI: 10.13272/j.issn.1671-251x.2016.01.001

Design of loading process tracing and feedback system of coal storage yard

More Information
  • For low supervision efficiency of coal storage yard working, a loading process tracing and feedback system of coal storage yard based on GPS was designed, and design scheme of positioning terminal of loader shipment based on STM32F103VET6 was expounded. In the system, electronic fence is set in coal storage area by use of GPS technology, thus multi coal type storage areas are divided according to distribution of coal types. GPS positioning information of the loaders is uploaded to server real-timely through GPRS network by the positioning terminal, so as to record, analyze and manage loading process data real-timely. The system can be connected to existing coal mine weighing system and weighing data can be forwarded to the positioning terminal real-timely for improving loading efficiency.
  • Related Articles

    [1]CHEN Yuanyuan, LIU Yuchu. Synchronous clock system of transient electromagnetic based on GPS and OCXO[J]. Journal of Mine Automation, 2017, 43(3): 10-15. DOI: 10.13272/j.issn.1671-251x.2017.03.003
    [2]ZHAO Jianwei, WANG Hongyan, TANG Bing, YANG Zhongya. Research of GPS track generation and location based on mobile robot[J]. Journal of Mine Automation, 2016, 42(1): 17-19. DOI: 10.13272/j.issn.1671-251x.2016.01.006
    [3]LIU Xianfeng, QIAO Hongzhe. Design of remote loader monitoring system based on ARM[J]. Journal of Mine Automation, 2015, 41(9): 84-86.
    [4]LIU Dong, ZHENG Nan-shan, QIAN Jin. Application Research of GPS Technology in Vertical Deformation Monitoring of Coal Mine[J]. Journal of Mine Automation, 2012, 38(7): 14-17.
    [5]ZHU Shang-song, YU Chun-lei. A Wireless Network Structure Combining ZigBee and GPRS[J]. Journal of Mine Automation, 2010, 36(10): 88-90.
    [6]JIANG Jiao-lian, TANG Li-zhong, BAI Bing. Design of GPRS Microseism Monitoring and SMS Alarm System[J]. Journal of Mine Automation, 2010, 36(5): 116-118.
    [7]CAO Zhen-guan, WU Yong-xiang, LI Hua-xi. Safety Monitoring and Control System of Integrated Parameters of Airshaft Based on GPRS[J]. Journal of Mine Automation, 2008, 34(2): 65-67.
    [8]XU Le-nian, ZHEN Yan-xiang, YUN Yu-liang. Wireless Remote Measurement System of Drill Hydrology Based on GPRS[J]. Journal of Mine Automation, 2007, 33(5): 52-55.
    [9]ZHANG Jia, FU Hui-sheng. Using GPRS to Realize Real-time Remote Monitoring and Control for Production of Coal Mine[J]. Journal of Mine Automation, 2007, 33(2): 46-48.
    [10]KUANG Shao-long. Development of Clock Extended Device Using GPS Receiver[J]. Journal of Mine Automation, 2005, 31(3): 64-65.

Catalog

    Article Metrics

    Article views (75) PDF downloads (10) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return