2种灰色模型在矿区地表沉陷预计中的适用性

石晓宇, 张燕海, 杨可明, 姚树一, 王剑

石晓宇,张燕海,杨可明,等.2种灰色模型在矿区地表沉陷预计中的适用性[J].工矿自动化,2020,46(5):28-33.. DOI: 10.13272/j.issn.1671-251x.2019090088
引用本文: 石晓宇,张燕海,杨可明,等.2种灰色模型在矿区地表沉陷预计中的适用性[J].工矿自动化,2020,46(5):28-33.. DOI: 10.13272/j.issn.1671-251x.2019090088
SHI Xiaoyu, ZHANG Yanhai, YANG Keming, YAO Shuyi, WANG Jian. Applicability of two grey models in earth-surface subsidence prediction of mining area[J]. Journal of Mine Automation, 2020, 46(5): 28-33. DOI: 10.13272/j.issn.1671-251x.2019090088
Citation: SHI Xiaoyu, ZHANG Yanhai, YANG Keming, YAO Shuyi, WANG Jian. Applicability of two grey models in earth-surface subsidence prediction of mining area[J]. Journal of Mine Automation, 2020, 46(5): 28-33. DOI: 10.13272/j.issn.1671-251x.2019090088

2种灰色模型在矿区地表沉陷预计中的适用性

基金项目: 

中央高校基本科研业务费专项资金资助项目(2009QD02)

国家自然科学基金资助项目(41971401)

详细信息
  • 中图分类号: TD173

Applicability of two grey models in earth-surface subsidence prediction of mining area

  • 摘要: 目前矿区地表单点沉陷动态预计方法主要基于传统的水准测量数据,监测方法单一,成本高,观测点易破坏,不能保证地表形变信息的实时性,且采用灰色模型进行地表沉陷预计时只针对单一模型的应用,没有结合模型自身特点分析其适用性。以袁店二矿7221工作面为试验区域,采用合成孔径雷达差分干涉测量技术监测矿区地表沉陷量,分别建立了描述沉陷量与时间关系的GM(1,1)与灰色Verhulst模型进行地表沉陷量预计,实现了矿区地表沉陷监测与动态预计一体化。通过比较、分析GM(1,1)与灰色Verhulst模型对地表沉陷量的拟合及预计结果,得出了2种灰色模型在矿区地表沉陷预计中的适用性:在矿区开采沉陷开始至活跃前期,若地表单点沉陷量曲线呈近似单峰型,则宜采用GM(1,1)进行短期预计;当矿区地表沉陷进入衰退阶段,单点沉陷量曲线呈平底饱和状态,则宜采用灰色Verhulst模型进行中长期预计。
    Abstract: Existing dynamic single-point subsidence prediction methods of mining area earth-surface are mainly based on traditional leveling measurement data, which have single monitoring mode, high cost and easily destroyed observation points, and cannot guarantee real-time of earth-surface deformation information. Moreover, application of grey model for earth-surface subsidence prediction is only for a single model and its applicability is not analyzed according to characteristics of the model itself. Taking 7221 working face of Yuandian No.2 Mine as an experimental zone, earth-surface subsidence value is measured by differential interferometry synthetic aperture radar technology, and then GM(1,1) and grey Verhulst model that describe the relationship between subsidence and time are built separately for predicting earth-surface subsidence value, so as to realize the integration of earth-surface subsidence monitoring and dynamic prediction of mining area. Through comparing and analyzing fitting and prediction results of earth-surface subsidence value between GM(1,1) and grey Verhulst model, the applicability of the two grey models in earth-surface subsidence prediction of mining area is obtained: GM(1,1) should be used for short-term prediction from beginning of mining subsidence to early active stage if subsidence value curve of single point is approximately unimodal; when earth-surface subsidence enters into decline stage and subsidence value curve of single point is in flat-bottom saturation, gray Verhulst model should be used for medium and long-term prediction.
  • 期刊类型引用(5)

    1. 薛永安,邹友峰,冀哲,张文志. 老采空区残余变形组合预测研究. 测绘科学. 2024(04): 43-56 . 百度学术
    2. 石力帆,廉旭刚,韩雨. 基于粒子群算法最优化Verhulst模型的开采残余下沉预测. 科学技术与工程. 2024(18): 7592-7598 . 百度学术
    3. 张凯月. 基于灰色模型的矿区地表沉降预测研究. 河南科技. 2022(15): 51-54 . 百度学术
    4. 张海君,吴奕枢,王飞,谢昆仑. 准格尔煤田龙王沟煤矿特厚煤层综放开采地表沉陷规律. 西安科技大学学报. 2022(05): 874-883 . 百度学术
    5. 陈晶,水青娜,王俊智,田光辉,王心义. 基于加权组合模型的地下水水位拟合. 黄河水利职业技术学院学报. 2021(04): 9-13 . 百度学术

    其他类型引用(3)

计量
  • 文章访问数:  64
  • HTML全文浏览量:  12
  • PDF下载量:  16
  • 被引次数: 8
出版历程
  • 刊出日期:  2020-05-19

目录

    /

    返回文章
    返回