A Method of Connecting CDT into Whole Mine Integrated Automation System
-
Graphical Abstract
-
Abstract
In view of problem that CDT interface provided by automation system of coal mine surface transformer substation is difficult to connect into whole mine integrated automation system, the paper proposed a method of using KingView software as transformation tool to change CDT interface into OPC, so as to connect power monitoring system into platform of whole mine integrated automation system.
-
-