XU Yu-jun, XU Min, ZHNAG Xian-feng, WEI Hua-feng, HUAI Li. Research of Coal Mine Railway Transport Monitoring System Based on Industrial Ethernet[J]. Journal of Mine Automation, 2012, 38(6): 84-86.
Citation: XU Yu-jun, XU Min, ZHNAG Xian-feng, WEI Hua-feng, HUAI Li. Research of Coal Mine Railway Transport Monitoring System Based on Industrial Ethernet[J]. Journal of Mine Automation, 2012, 38(6): 84-86.

Research of Coal Mine Railway Transport Monitoring System Based on Industrial Ethernet

More Information
  • In view of problems of bad anti-interference ability, unstable communication and uneasy to locate for locomotive existed in mine locomotive transport monitoring system, the paper introduced design of a railway transport monitoring system based on industrial Ethernet. It introduced general structure and main functions and characteristics of the system in details and gave solutions of statistics of passed axis. The actual application showed that the system meets with design requirements with strong anti-interference ability and accurate location for locomotive.
  • Related Articles

    [1]ZHAO Si-hai, HU Yu-wei, ZHAO Zhe-qian, DONG Wei-kang, GUO Ge, GUO Yan-che. Design of electrical control system of roadheader based on PLC[J]. Journal of Mine Automation, 2013, 39(8): 102-104. DOI: 10.7526/j.issn.1671-251X.2013.08.027
    [2]KANG Xin-kai, SUN Xi-ming, LIU Jian-zhao, DONG Pei. Design of Auxiliary Shaft Car Operating Control System Based on PLC[J]. Journal of Mine Automation, 2012, 38(12): 99-102.
    [3]HUANG Jin-feng~, ZHANG Jin~, LI Zhan-xian~(, 2). Realization of Communication between PLC and Frequency-converter[J]. Journal of Mine Automation, 2007, 33(5): 95-97.
    [4]SHAN Chang-kao, MA Xiao-ping, LIU Da-kui. The Application of PLC in the Monitoring and Control System for Xihe Gate[J]. Journal of Mine Automation, 2005, 31(6): 78-79.
    [5]DAI Peng, ZHOU Xiao-feng, GEN Yi-wen, WANG Gui-feng, CAO Chuan-gong. The Communication between iFIX and PLC Based on OPC[J]. Journal of Mine Automation, 2005, 31(6): 75-77.
    [6]CHEN Yong-li, ZHANG Zhen-bao, CHEN Peng, YANG Wen-fei. Application of PLC in System of Automatic Loading and Unloading in Rock Dumping Yard[J]. Journal of Mine Automation, 2003, 29(1): 14-15.
    [7]JU Rong, JU Yong. Serial Communication with PLC by MSComm ActiveX[J]. Journal of Mine Automation, 2002, 28(6): 5-7.
    [8]WANG Jun , YIN Yuan-yuan , BAO Hai-yong . Designing Method of Multi-parameter Monitoring and Control System Based on PLC[J]. Journal of Mine Automation, 2002, 28(4): 23-24.
    [9]ZHANG Lin. Network Linking System with PLC of Series SYSMAC[J]. Journal of Mine Automation, 2000, 26(5): 31-32.
    [10]HU Sui-ya. A Kind of Centralized and Decentralized Control System with PLC[J]. Journal of Mine Automation, 2000, 26(4): 22-23.

Catalog

    Article Metrics

    Article views (76) PDF downloads (9) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return