GUO Yin-jing, LI Chun-qiu, FANG Lu-tao. Research of Timing Synchronization of Mine Through-the-Earth Communication System[J]. Journal of Mine Automation, 2012, 38(1): 36-39.
Citation: GUO Yin-jing, LI Chun-qiu, FANG Lu-tao. Research of Timing Synchronization of Mine Through-the-Earth Communication System[J]. Journal of Mine Automation, 2012, 38(1): 36-39.

Research of Timing Synchronization of Mine Through-the-Earth Communication System

More Information
  • The paper researched timing synchronization of mine through-the-earth communication system. It built a simple elastic wave medium model of earth channel firstly and obtained multi-path delay of the model is 20 ms through calculation. Then it simulated, analyzed and compared application performances of data auxiliary timing synchronization method and non data auxiliary timing synchronization method in the through-the-earth communication system by use of Matlab, and got following conclusions: the non data auxiliary timing synchronization method requires high signal power of the through-the-earth communication system, and the data auxiliary timing synchronization method has higher reliability and is fitter for the through-the-earth communication system. Finally, it simulated decoding error rate of the through-the-earth communication system which used the data auxiliary timing synchronization method under the condition that length of cyclic prefix of OFDM was 0.5, 2, 4 times of the maximum delay time separately and SNR was from 0 dB to 18 dB. The simulation result showed that the decoding error rate of the through-the earth communication system achieves 10-5 order of magnitude when the length of cyclic prefix of OFDM is above 2 times of the maximum delay time and the SNR is above 16 dB, which verifies application reliability of the data auxiliary timing synchronization method in the through-the-earth communication system.
  • Related Articles

    [1]YU Shuohang, RONG Xiang, YANG Fan, WEI Lipeng. A zero-crossing point prediction algorithm of short-circuit current for mine-used phase-controlled switching[J]. Journal of Mine Automation, 2020, 46(6): 103-107. DOI: 10.13272/j.issn.1671-251x.2020030074
    [2]TIAN Shu, LIU Ying, MEI Xiao-li. Research of Influence of Grid Connection of Distributed Generation on Current Protection of Distribution Network[J]. Journal of Mine Automation, 2011, 37(10): 39-43.
    [3]WU Yu-kang, DENG Shi-jian, XIE Xiao-liang. Application of MS5534B in Atmosphere Pressure Monitoring System[J]. Journal of Mine Automation, 2010, 36(9): 114-116.
    [4]MA Jian-li, GUO Jia, QIAN Ying. Design of Automatic Compensation Device of Capacitive Current for Coal Mine Power Supply System[J]. Journal of Mine Automation, 2009, 35(5): 87-89.
    [5]YAN Xiao, SHEN Hua. Harmonic Treatment of Power Supply System in No2 Jining Coal Mine[J]. Journal of Mine Automation, 2003, 29(2): 42-43.
    [6]XU Xiang-dong, HOU Qiu-hong. Solution Scheme of Arc Short Circuit of Grounding of 660V Power Supply System in Coal Preparation Plants[J]. Journal of Mine Automation, 2002, 28(3): 58-58.
    [7]LI Gang, LI Hong-guang. The Analysis of Current-limiting Reactor's Influences on Short-200[J]. Journal of Mine Automation, 2001, 27(3): 31-32.

Catalog

    Article Metrics

    Article views (29) PDF downloads (10) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return