ZHANG Zhao-yong, LIU Bin-kun, HE Ping. To Achieve Synchronous Control of Sinking Hoist by Programmable Controller[J]. Journal of Mine Automation, 1996, 22(4): 8-10.
Citation: ZHANG Zhao-yong, LIU Bin-kun, HE Ping. To Achieve Synchronous Control of Sinking Hoist by Programmable Controller[J]. Journal of Mine Automation, 1996, 22(4): 8-10.

To Achieve Synchronous Control of Sinking Hoist by Programmable Controller

  • Programmable Controller is used as main controller in synchronously controlling up to 4 sinking hoists,which ensures the safety of sinking stage’s elevation and subsidence in vertical shaft construction.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return