Citation: | LIU Fang, SONG Zheng-chang, YANG Li, LI Jia. Influences of SPeed and Piston Stroke on Performance of Air-powered Engine[J]. Journal of Mine Automation, 2009, 35(9): 38-40. |
[1] | BAO Xiping, JI Zhi. A switching method of winding series-parallel of high-performance permanent magnet synchronous motor and its simulation study[J]. Journal of Mine Automation, 2014, 40(10): 52-56. DOI: 10.13272/j.issn.1671-251x.2014.10.014 |
[2] | ZHANG Chuan-wei, WAN Ying-ying, XI Zong-hu, ZHANG Rui-fang. Simulation research of vector control system for coal mine trackless rubber-tyred electric vehicle[J]. Journal of Mine Automation, 2013, 39(9): 71-74. DOI: 10.7526/j.issn.1671-251X.2013.09.019 |
[3] | WANG Xian-bo, BU Wen-shao, DING Zhe, SHAN Dong-liang. Modeling and Simulation of Three-phase PWM Rectifier Based on Fixed Switching Frequency Control Strategy[J]. Journal of Mine Automation, 2010, 36(8): 68-72. |
[4] | MA Wei, BAO Guang-qing. Modeling and Simulation for Direct-drive Permanent Magnet Wind Power System[J]. Journal of Mine Automation, 2010, 36(8): 49-53. |
[5] | GUO Yi-dan, SONG Shu-zhong, MA Jian-wei, ZHU Jin-hong. Analysis and Simulation of IGBT Power Consume Based on PSpice[J]. Journal of Mine Automation, 2009, 35(10): 53-56. |
[6] | WANG Xiu-juan, LI Shi-yin, LIU Qiong, GAO Song-hua. Simulation of TCP Congestion Control Based on Opnet[J]. Journal of Mine Automation, 2009, 35(8): 41-44. |
[7] | QIAN Yi-bin, WU Xiao-jie, DAI Peng. Research of Position Control and Its Matlab Simulatio[J]. Journal of Mine Automation, 2008, 34(1): 24-26. |
[8] | TANG Zhao-hui, ZHANG Xiao-xing, YU Shou-yi. Study of Nonlinear Simulation and Modeling of SR Motor[J]. Journal of Mine Automation, 2007, 33(1): 12-14. |
[9] | HUANG Shao-ping, LI Yong-jia. Simulation Study on Speed Regulating System of Chopper-fed for DC Motor Based on MATLAB[J]. Journal of Mine Automation, 2005, 31(1): 10-12. |
[10] | LI Han-shan , REN Yong-feng , ZHENG Hong . Main Parameters Design and Simulation Research of Shunt Hybrid Active Power Filter[J]. Journal of Mine Automation, 2003, 29(6): 15-17. |