Citation: | QU Xiao-lei, CAO Yun-feng. Design of Flight Control System for Aerial Robot Based on ARM[J]. Journal of Mine Automation, 2010, 36(1): 111-114. |
[1] | BAO Xiping, JI Zhi. A switching method of winding series-parallel of high-performance permanent magnet synchronous motor and its simulation study[J]. Journal of Mine Automation, 2014, 40(10): 52-56. DOI: 10.13272/j.issn.1671-251x.2014.10.014 |
[2] | ZHANG Chuan-wei, WAN Ying-ying, XI Zong-hu, ZHANG Rui-fang. Simulation research of vector control system for coal mine trackless rubber-tyred electric vehicle[J]. Journal of Mine Automation, 2013, 39(9): 71-74. DOI: 10.7526/j.issn.1671-251X.2013.09.019 |
[3] | YANG Ning, ZHANG Lin, XU Chun-yu. Research of dead-time compensation strategy for three-level inverter[J]. Journal of Mine Automation, 2013, 39(5): 55-59. |
[4] | WANG Zheng-wei~, XUE Guo-xin~, SHEN Fu-chang~, LU Jin-fang~. Analysis of System Characteristics for Waste Incinerator and Its Simulatio[J]. Journal of Mine Automation, 2009, 35(10): 73-76. |
[5] | ZHANG Dong-liang, LI Gang, WANG Song, JI Jian-ping. Simulation and Analysis of Three-phase Four-wire Four-leg APF with Deadbeat Control[J]. Journal of Mine Automation, 2009, 35(8): 55-58. |
[6] | LIU Shu-qin, SONG Jian-cheng. Simulation Research of Single-phase to Ground Fault of 10 kV Power Supply System of Mine[J]. Journal of Mine Automation, 2008, 34(6): 9-12. |
[7] | QIAN Yi-bin, WU Xiao-jie, DAI Peng. Research of Position Control and Its Matlab Simulatio[J]. Journal of Mine Automation, 2008, 34(1): 24-26. |
[8] | HUANG Shao-ping, LI Yong-jia. Simulation Study on Speed Regulating System of Chopper-fed for DC Motor Based on MATLAB[J]. Journal of Mine Automation, 2005, 31(1): 10-12. |
[9] | LI Han-shan , REN Yong-feng , ZHENG Hong . Main Parameters Design and Simulation Research of Shunt Hybrid Active Power Filter[J]. Journal of Mine Automation, 2003, 29(6): 15-17. |
[10] | FU Zhou-xing, LI Sheng-jian. Simulation Research in Microprocessor-based Relay Protection Based on Wavelet Transform[J]. Journal of Mine Automation, 2003, 29(4): 6-8. |