Citation: | LI Wen-hua, LI Tao, YANG Xu. Underground Drainage System Based on Artificial Intelligence Control[J]. Journal of Mine Automation, 2010, 36(1): 88-90. |
[1] | BA Xianyi, LI Biao, HE Wei. Anti-freezing control method for coal mine drainage system[J]. Journal of Mine Automation, 2024, 50(S1): 183-186. |
[2] | HAN Xiuqi. Optimal control of mine multi-level relay drainage system[J]. Journal of Mine Automation, 2020, 46(9): 109-112. DOI: 10.13272/j.issn.1671-251x.2019120057 |
[3] | 付翔, 王然风, 袁继成. 煤矿乳化液泵变频/工频切换控制[J]. Journal of Mine Automation, 2017, 43(1): 81-84. DOI: 10.13272/j.issn.1671-251x.2017.01.020 |
[4] | JIANG Wei. Improvement of control scheme of peak load shafting of coal mine drainage system[J]. Journal of Mine Automation, 2013, 39(7): 76-79. |
[5] | HUAI Li, TAN Yi-chuan, XU Yu-jun, ZHANG Xi-ping, CHENG Yu-long. Application of Automatic Control System of Main Drainage of Coal Mine Underground[J]. Journal of Mine Automation, 2012, 38(3): 63-65. |
[6] | LI Ya-zhe. Technical Process of Coal Mine Main Drainage System and Design of Its Automatic Control System[J]. Journal of Mine Automation, 2011, 37(5): 15-18. |
[7] | BU Xiang-quan~, ZHOU Shu-zhi~, PANG Ke-wang~. Design of Control System of Mine Drainage Pumps[J]. Journal of Mine Automation, 2007, 33(3): 5-7. |
[8] | CHEN Zi-chun, LIU Xiang-xi. Research of Automatic Control System for Pumps of Underground Central Pump Room and its Applicatio[J]. Journal of Mine Automation, 2007, 33(2): 77-79. |
[9] | LEI Ru-hai~, SHAO Zhong-ming~. Design of a Computer Control System Used in Underground Drainage[J]. Journal of Mine Automation, 2005, 31(6): 63-64. |
[10] | LI Sheng-wang , JI Gui-tang , ZHAO Xiao-xu , LIU Xian-biao . Automation Control System of Main Drainage Used in Coal Mine[J]. Journal of Mine Automation, 2002, 28(1): 3-5. |