LI Wen-hua, LI Tao, YANG Xu. Underground Drainage System Based on Artificial Intelligence Control[J]. Journal of Mine Automation, 2010, 36(1): 88-90.
Citation: LI Wen-hua, LI Tao, YANG Xu. Underground Drainage System Based on Artificial Intelligence Control[J]. Journal of Mine Automation, 2010, 36(1): 88-90.

Underground Drainage System Based on Artificial Intelligence Control

More Information
  • By analyzing common artificial intelligence technologies, the paper introduced design of software and structure of a drainage system of coal mine underground based on artificial intelligence control. By detecting water level in sump and other parameters, the system controls pumps to work by turns and standby pump to start at duly time, so as to schedule dumps run reasonably, and it has function of fault alarming, which decreases labor intensity of workers greatly and improves utilization rate of devices. The system also has good expansibility and is fit for different fields.
  • Related Articles

    [1]BA Xianyi, LI Biao, HE Wei. Anti-freezing control method for coal mine drainage system[J]. Journal of Mine Automation, 2024, 50(S1): 183-186.
    [2]HAN Xiuqi. Optimal control of mine multi-level relay drainage system[J]. Journal of Mine Automation, 2020, 46(9): 109-112. DOI: 10.13272/j.issn.1671-251x.2019120057
    [3]付翔, 王然风, 袁继成. 煤矿乳化液泵变频/工频切换控制[J]. Journal of Mine Automation, 2017, 43(1): 81-84. DOI: 10.13272/j.issn.1671-251x.2017.01.020
    [4]JIANG Wei. Improvement of control scheme of peak load shafting of coal mine drainage system[J]. Journal of Mine Automation, 2013, 39(7): 76-79.
    [5]HUAI Li, TAN Yi-chuan, XU Yu-jun, ZHANG Xi-ping, CHENG Yu-long. Application of Automatic Control System of Main Drainage of Coal Mine Underground[J]. Journal of Mine Automation, 2012, 38(3): 63-65.
    [6]LI Ya-zhe. Technical Process of Coal Mine Main Drainage System and Design of Its Automatic Control System[J]. Journal of Mine Automation, 2011, 37(5): 15-18.
    [7]BU Xiang-quan~, ZHOU Shu-zhi~, PANG Ke-wang~. Design of Control System of Mine Drainage Pumps[J]. Journal of Mine Automation, 2007, 33(3): 5-7.
    [8]CHEN Zi-chun, LIU Xiang-xi. Research of Automatic Control System for Pumps of Underground Central Pump Room and its Applicatio[J]. Journal of Mine Automation, 2007, 33(2): 77-79.
    [9]LEI Ru-hai~, SHAO Zhong-ming~. Design of a Computer Control System Used in Underground Drainage[J]. Journal of Mine Automation, 2005, 31(6): 63-64.
    [10]LI Sheng-wang , JI Gui-tang , ZHAO Xiao-xu , LIU Xian-biao . Automation Control System of Main Drainage Used in Coal Mine[J]. Journal of Mine Automation, 2002, 28(1): 3-5.

Catalog

    Article Metrics

    Article views PDF downloads Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return