LI Fu. Renovation and Optimization of Operation Mode of Dual-circuit Power Supply System in Coal Mine[J]. Industry and Mine Automation, 2011, 37(7): 24-26.
Citation: LI Fu. Renovation and Optimization of Operation Mode of Dual-circuit Power Supply System in Coal Mine[J]. Industry and Mine Automation, 2011, 37(7): 24-26.

Renovation and Optimization of Operation Mode of Dual-circuit Power Supply System in Coal Mine

  • Publish Date: 2011-07-10
  • For the problem that most dual-circuit power supply systems in coal mine underground could not accord with requirements of version 2009 of Coal Mine Safety Regulations, the paper presented a way of renovation and optimization of operation mode of dual-circuit power supply system, and pointed out that dual-circuit power supply system which uses parallel operation mode still has a problem of uneasy switchover caused by electric resetting and the problem should be further researched.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (51) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return