HE Yao-yi~, WANG Yuan~. Discussion of Construction of Integrated Production Dispatching and Command System for Coal Groups[J]. Industry and Mine Automation, 2010, 36(5): 23-27.
Citation: HE Yao-yi~, WANG Yuan~. Discussion of Construction of Integrated Production Dispatching and Command System for Coal Groups[J]. Industry and Mine Automation, 2010, 36(5): 23-27.

Discussion of Construction of Integrated Production Dispatching and Command System for Coal Groups

  • The paper analyzed current situation of informatization construction for coal groups and functions of management plateform of integrated production dispatching and command system for coal groups.Then it put forward a kind of three-layer logical architecture for the system,and introduced key problems in construction of the system such as classificated transmission of data,management of classificated rights of data and and requirement of integration and specification of the system.The paper has a certain significance for construction of integrated production dispatching and command system for coal groups.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (62) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return