Reliability Analysis of Flood Control Capacity of Tailing Pond
-
Graphical Abstract
-
Abstract
Taking the dry tailing pond of Mohan Guangming Mining Plant for example, reliability of flood control capacity of the tailing pond was analyzed in the paper. Through calculating peak discharge and flood volume and checking flood regulating, flood control capacity of the tailing pond was determined. The calculation results showed that the tailing pond meets flood control requirements.
-
-