WANG De-tang~, XIAO Xing-ming~, ZHAO Yu-bin~, FU Xiang-yun~ . Analysis and Implementation for Preventing Overload in Loading and Unloading System[J]. Journal of Mine Automation, 2005, 31(5): 36-37.
Citation:
WANG De-tang~, XIAO Xing-ming~, ZHAO Yu-bin~, FU Xiang-yun~ . Analysis and Implementation for Preventing Overload in Loading and Unloading System[J]. Journal of Mine Automation, 2005, 31(5): 36-37.
WANG De-tang~, XIAO Xing-ming~, ZHAO Yu-bin~, FU Xiang-yun~ . Analysis and Implementation for Preventing Overload in Loading and Unloading System[J]. Journal of Mine Automation, 2005, 31(5): 36-37.
Citation:
WANG De-tang~, XIAO Xing-ming~, ZHAO Yu-bin~, FU Xiang-yun~ . Analysis and Implementation for Preventing Overload in Loading and Unloading System[J]. Journal of Mine Automation, 2005, 31(5): 36-37.
Analysis and Implementation for Preventing Overload in Loading and Unloading System
The article analyzed how to prevent from overload and reload phenomenon in a mine DC hoister in main shaft, put forward a new method of inspecting motors current parameter to estimate mine- ral quantity in container, and described how to realize the method in application system.