HUANG Shao-ping, LI Yong-jia. Simulation Study on Speed Regulating System of Chopper-fed for DC Motor Based on MATLAB[J]. Journal of Mine Automation, 2005, 31(1): 10-12.
Citation: HUANG Shao-ping, LI Yong-jia. Simulation Study on Speed Regulating System of Chopper-fed for DC Motor Based on MATLAB[J]. Journal of Mine Automation, 2005, 31(1): 10-12.

Simulation Study on Speed Regulating System of Chopper-fed for DC Motor Based on MATLAB

More Information
  • Using Power System Blockset (PSB) and Simulink of MATLAB, a simulation model of double-closed-loop speed regulating system of chopper-fed for DC motor was built, and simulation result was given.
  • Related Articles

    [1]GAO Jian. Stability evaluation of waste dump based on numerical simulation[J]. Journal of Mine Automation, 2024, 50(S2): 76-78,81.
    [2]SHI Yinbi. Research on numerical simulation and optimization of ventilation rate in Wuhushan Coal Mine[J]. Journal of Mine Automation, 2021, 47(S1): 75-77.
    [3]LIU Tianqi. Numerical simulation of flame propagation characteristics of coal-dust explosion in horizontal pipeline space[J]. Journal of Mine Automation, 2019, 45(7): 59-65. DOI: 10.13272/j.issn.1671-251x.2019020008
    [4]ZHANG Xiaoyi, WANG Deming, YANG Xuehua. Numerical simulation of cable fire in coal mine chamber[J]. Journal of Mine Automation, 2019, 45(3): 52-55. DOI: 10.13272/j.issn.1671-251x.2018060049
    [5]WEI Fengqing, CHENG Peidong, ZHANG Junxiang, DU Xiaoqi. Study on numerical simulation of effective drainage radius of drilling hole in coal seam[J]. Journal of Mine Automation, 2016, 42(7): 25-29. DOI: 10.13272/j.issn.1671-251x.2016.07.007
    [6]WANG Bo, SONG Yubin, WANG Xin. Goal driven optimization design of flameproof shell based on ANSYS Workbench[J]. Journal of Mine Automation, 2015, 41(12): 70-72. DOI: 10.13272/j.issn.1671-251x.2015.12.019
    [7]QI Dexin, ZHANG Baogang, LI Dongxiao. Improvement of magnetic barriers structure of permanent magnet synchronous motor based on ANSYS[J]. Journal of Mine Automation, 2014, 40(10): 102-105. DOI: 10.13272/j.issn.1671-251x.2014.10.028
    [8]HU Wan-qing, HU Qing-yi, LIN Xue, LIN Shan-ming. Research of temperature monitoring system for cable joint based on temperature field[J]. Journal of Mine Automation, 2013, 39(6): 90-93.
    [9]HAO Chang-sheng, WANG Hong-sheng, PANG Run-fang. Research of Numerical Simulation of Process of Mine Gas Pre-draining by Pinnate Boring[J]. Journal of Mine Automation, 2009, 35(10): 32-35.
    [10]LI Jin-kui, LIU Dong-sheng, LI Xue-bin, XIONG Zhen-hua. Numerical Simulation Research of Pressure Relief Mechanism of Borehole of Small Pillar Stress Concentrated Areas[J]. Journal of Mine Automation, 2009, 35(6): 1-4.

Catalog

    Article Metrics

    Article views (68) PDF downloads (0) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return