YUAN Wei~, DONG Xin-wei~, XU Min~. PSCAD Simulation Research of Fault of Voltage Transformer of Coal Mine Power Network[J]. Journal of Mine Automation, 2008, 34(5): 26-29.
Citation: YUAN Wei~, DONG Xin-wei~, XU Min~. PSCAD Simulation Research of Fault of Voltage Transformer of Coal Mine Power Network[J]. Journal of Mine Automation, 2008, 34(5): 26-29.

PSCAD Simulation Research of Fault of Voltage Transformer of Coal Mine Power Network

More Information
  • The burning out of voltage transformer happens occasionally in coal mine power network because of single-phase grounded fault. According to equivalent model of single-phase grounded fault of power network, simulation analysis was presented on the transient characteristics of the primary side current of PT in the paper. It was considered that the causation of fault of PT is large single phase-toground capacitive current in coal mine power network. And a group of voltage transformer in 6 kV distribution system was simulated based on PSCAD/EMTDC. Three kinds of eliminating resonance method in different condition were compared including connecting a nonlinear resistance to neutral point of high voltage side of three-phase PT, connecting a damping resistance to the secondary assistant windings of three-phase PT, grouding neutral point through arc suppression coil. At last the paper indicated that neutral grounded by arc extinction coil is the best solution of single-phase grounding fault in coal mine(power network.
  • Related Articles

    [1]YANG Wen-gang, HE Cheng, WANG Fu-liang. Modeling Simulation of Variable Frequency Transformer and Its Analysis[J]. Journal of Mine Automation, 2012, 38(9): 43-46.
    [2]PAN Ming-fu. Development of Microcomputer-controlled TSC Arc Suppression Coil[J]. Journal of Mine Automation, 2011, 37(9): 111-113.
    [3]SONG Zhao-zhao, MA Xiao-ping, BU Li. A New Type of Arc Suppression Coil with Full Compensatio[J]. Journal of Mine Automation, 2011, 37(8): 61-64.
    [4]LV Qi-ming, XIA Yuan-tao, WANG Xiao-chen, WANG Yu-feng. Design of SCADA-EMS Power Dispatching System of Coal Mine Based on GPS[J]. Journal of Mine Automation, 2011, 37(3): 91-94.
    [5]HAN Xiao-xi. The Fault of Control System of PLC and Its Treatment[J]. Journal of Mine Automation, 2002, 28(6): 43-44.
    [6]WANG Qi-ju. Study on Extinction Coil Equipped in Coal Mine Power Supply System[J]. Journal of Mine Automation, 2002, 28(4): 16-17.
    [7]WANG Fu-xing , YAN Shi-hua . The Arc-suppression Coil with Three-phases and Five-columns System and Its Application in Coal Mine Power Network[J]. Journal of Mine Automation, 2001, 27(4): 9-11.
    [8]SONG Yun-zhong. The Application of Petri Net in Fault Diagnosing for Speed and Voltage Regulated System of Coal Mine Winch[J]. Journal of Mine Automation, 2001, 27(3): 15-17.
    [9]ZHANG Wei. Analysis and Treatment of Common Faults of Remote Substation in Power Networks SCADA System[J]. Journal of Mine Automation, 2001, 27(2): 38-39.

Catalog

    Article Metrics

    Article views (74) PDF downloads (0) Cited by()