WANG Yu-kun, WU feng. Implementation of Improved Dijkstra Algorithm for Choosing the Best Escape Route in Mine’s Emergency Rescue[J]. Journal of Mine Automation, 2008, 34(5): 13-15.
Citation: WANG Yu-kun, WU feng. Implementation of Improved Dijkstra Algorithm for Choosing the Best Escape Route in Mine’s Emergency Rescue[J]. Journal of Mine Automation, 2008, 34(5): 13-15.

Implementation of Improved Dijkstra Algorithm for Choosing the Best Escape Route in Mine’s Emergency Rescue

More Information
  • The paper introduced the status of mine’s emergency rescue and determination method of the best escape route. Based on the analysis of Dijkstra’s algorithm and according to features of mine tunnel laneway planar network,it searched the shortest path within a sector region to complete the optimization of the Dijkstra algorithm for escape route in mine’s emergency rescue from restricting search scope and direction. The optimization algorithm can find a shortest path according to start node,goal node and angle of searching sector given by user, and the number of processed nodes account for 2a /360 of classical algorithm, so speed and efficiency of the optimization algorithm are improved.
  • Related Articles

    [1]WANG Mei, MA Xiao-ping, JIN Li. Design of Water Supply Control System with Constant Pressure Based on S7-200[J]. Journal of Mine Automation, 2010, 36(7): 129-131.
    [2]YUAN Xiao-dong~, DENG Xian-ming~, WANG Dong-dong~, LU Jia~, ZHANG Min~. Integrated Automation System for Drainage of Coal Mine Based on Ethernet[J]. Journal of Mine Automation, 2009, 35(7): 7-10.
    [3]WU Xin-cai~, ZHANG Ming-xu~, WANG Na~. Application of PLC Fuzzy Controller in Slime Water Treatment[J]. Journal of Mine Automation, 2007, 33(5): 11-13.
    [4]QIAO Wei-de. Using Fuzzy Control to Realize Water Supply with Frequency Conversion Speed Regulation and Constant Pressure[J]. Journal of Mine Automation, 2007, 33(3): 118-120.
    [5]ZHANG Ming-guang. Control System of Production Process for Cement Based on PLC[J]. Journal of Mine Automation, 2004, 30(3): 42-44.
    [6]CHEN Yong-li, ZHANG Zhen-bao, CHEN Peng, YANG Wen-fei. Application of PLC in System of Automatic Loading and Unloading in Rock Dumping Yard[J]. Journal of Mine Automation, 2003, 29(1): 14-15.
    [7]JU Rong, JU Yong. Serial Communication with PLC by MSComm ActiveX[J]. Journal of Mine Automation, 2002, 28(6): 5-7.
    [8]WANG Jun , YIN Yuan-yuan , BAO Hai-yong . Designing Method of Multi-parameter Monitoring and Control System Based on PLC[J]. Journal of Mine Automation, 2002, 28(4): 23-24.
    [9]ZHANG Lin. Network Linking System with PLC of Series SYSMAC[J]. Journal of Mine Automation, 2000, 26(5): 31-32.
    [10]HU Sui-ya. A Kind of Centralized and Decentralized Control System with PLC[J]. Journal of Mine Automation, 2000, 26(4): 22-23.

Catalog

    Article Metrics

    Article views (96) PDF downloads (0) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return