TAN Xing-guo. Reform of Networked Electric Control System of Hoister of the Fifth Coal Mine of Pingdingshan Mining Group[J]. Journal of Mine Automation, 2008, 34(1): 57-59.
Citation: TAN Xing-guo. Reform of Networked Electric Control System of Hoister of the Fifth Coal Mine of Pingdingshan Mining Group[J]. Journal of Mine Automation, 2008, 34(1): 57-59.

Reform of Networked Electric Control System of Hoister of the Fifth Coal Mine of Pingdingshan Mining Group

More Information
  • Electric control system of main hoister of the fifth coal mine of Pingdingshan Mining Group adopted relay-contactor control method,which was backward and serious aging, needed to be reformed immediately. According to the characteristics of the coal mine, the paper provided three reforming methods and analyzed the advantages and shortcomings of the reforming methods, gave the best reforming method for the coal mine. It also analyzed several important segments of reforming of networked control system.
  • Related Articles

    [1]JIANG Lei, YANG Liuming, WU Fangda, HAN Huijie, ZHOU Xue. Underground positioning method based on GMapping algorithm and fingerprint map constructio[J]. Journal of Mine Automation, 2017, 43(9): 96-101. DOI: 10.13272/j.issn.1671-251x.2017.09.017
    [2]WANG Qianjin, MA Xiaoping, ZHANG Shoutia. Application of PLC soft redundancy in monitoring and control system for ventilator[J]. Journal of Mine Automation, 2014, 40(1): 93-96. DOI: 10.13272/j.issn.1671-251x.2014.01.025
    [3]LUO Yu-feng, LIU Yong, LI Fang. Application of Kalman filter in underground personnel tracking and positioning[J]. Journal of Mine Automation, 2013, 39(9): 54-58. DOI: 10.7526/j.issn.1671-251X.2013.09.015
    [4]ZHENG Tong-she. Development of Gas Geological Map Management Information System of Coal Mine[J]. Journal of Mine Automation, 2011, 37(9): 14-17.
    [5]KONG Wei-she. Analysis of Delay of Message Transmission of Profibus-DP Single Master-station System[J]. Journal of Mine Automation, 2011, 37(7): 50-53.
    [6]CHEN Mei, YAO Qi-yun, LI Xin, CHEN Wei, LIU Zhen-ying. Research of Real-time Performance of Profibus-DP Single Master-station System[J]. Journal of Mine Automation, 2011, 37(1): 64-67.
    [7]YANG WU-cheng~, SUN Jun-ru~, ZHANG Wu-gang~. Establishment of Fault Data Warehouse of Mine Local Ventilation System Based on OLAP[J]. Journal of Mine Automation, 2008, 34(3): 9-11.
    [8]ZHANG Chang-sen, DONG Peng-yong, XU Jing-tao. Design of Personnel Position System of Mine Based on ZigBee Technology[J]. Journal of Mine Automation, 2008, 34(2): 48-50.
    [10]ZHANG Wei. Treatment and Precautionary Measures for Common Faults of Main Station in Power Dispatching Automation System[J]. Journal of Mine Automation, 2001, 27(4): 43-44.

Catalog

    Article Metrics

    Article views (43) PDF downloads (0) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return