SI Weibin, MA Kexiang, LEI Zhirong, et al. Flexible arc suppression method for single-phase to ground fault in distribution network based on Z-type grounding transformer[J]. Journal of Mine Automation,2022,48(5):85-92. DOI: 10.13272/j.issn.1671-251x.2021110024
Citation: SI Weibin, MA Kexiang, LEI Zhirong, et al. Flexible arc suppression method for single-phase to ground fault in distribution network based on Z-type grounding transformer[J]. Journal of Mine Automation,2022,48(5):85-92. DOI: 10.13272/j.issn.1671-251x.2021110024

Flexible arc suppression method for single-phase to ground fault in distribution network based on Z-type grounding transformer

More Information
  • Received Date: November 09, 2021
  • Revised Date: April 23, 2022
  • Available Online: March 04, 2022
  • The coal mine power supply and distribution system usually adopts the neutral point non-effectively grounded method. Most of the power supply lines in this method use cable lines. The underground power supply system is complex and uses many voltage levels. When a single-phase to ground fault occurs, it is easy to form intermittent arcs at the grounding point. Moreover, the existing single-phase to ground fault arc suppression technology of the neutral point non-effectively grounded distribution network has the problem of poor arc suppression effect and difficulty in accurately measuring the parameters of the distribution network to the ground. The most common connection method of transformer winding in 10 kV substation of coal mine in China is delta connection. This mode needs to lead out neutral point and connect arc suppression coil artificially through special grounding transformer (mostly Z-type grounding transformer). In order to solve the above problems, a flexible arc suppression system for single-phase to ground fault of distribution network based on Z-type grounding transformer is designed. When the initial time of grounding fault occurs in the distribution network, the three-phase power supply electromotive force and the neutral point voltage of the power distribution network are firstly measured in real time. When the amplitude of the neutral point voltage is greater than 15% of the three-phase power supply electromotive force, it can be judged as a grounding fault. Compared with the three-phase power supply electromotive force, the phase with the smallest power supply electromotive force is the fault phase. After a single-phase to ground fault occurs, the fast switching switch corresponding to the fault phase is quickly closed. And the active inverter and the Z-type grounding transformer power conversion module are simultaneously put into operation. The Z-type grounding transformer power conversion module clamps the voltage of a neutral point in an opposite phase to be close to the electromotive force of the fault phase power supply. And the amplitude and the phase of the difference between the neutral voltage and the fault phase supply voltage are precisely compensated by the active inverter. Therefore, the control target of suppressing the voltage and the current at the fault point to zero is achieved. After a certain time delay, the fast switching switch is cut off. If the voltage of the neutral point is effectively reduced, it can be judged that the fault is a transient ground fault. And the normal operation of the power distribution network system can be restored. Otherwise, it is judged as a permanent fault. The measures to isolate the fault feeder are taken to restore the normal operation of the distribution network. The simulation results show that when the single-phase to ground fault transition resistance is 500 Ω and 3 000 Ω, the power conversion is only through the Z-type grounding transformer. The voltage and current suppression rate at the fault point reaches 79%-83%, which cannot fully achieve the effect of arc suppression. The flexible arc suppression system can effectively suppress the voltage and current at the fault point, with a suppression rate of more than 98%, realizing reliable arc suppression of single-phase to ground faults in the distribution network.
  • [1]
    罗超,耿蒲龙,曲兵妮,等. 矿井供电系统单相接地故障零模特征仿真研究[J]. 工矿自动化,2018,44(6):57-63.

    LUO Chao,GENG Pulong,QU Bingni,et al. Simulation research on zero-module characteristics of single-phase grounding fault in mine power supply system[J]. Industry and Mine Automation,2018,44(6):57-63.
    [2]
    司韶文. 煤矿电网单相间歇性电弧接地故障的研究[D]. 西安: 西安科技大学, 2021.

    SI Shaowen. Research of single-phase intermittent arc ground failure in coal distribution network[D]. Xi'an: Xi'an University of Science and Technology, 2021.
    [3]
    要焕年, 曹梅月. 电力系统谐振接地[M]. 北京: 中国电力出版社, 2009.

    YAO Huannian, CAO Meiyue. Resonant grounding of power system[M]. Beijing: China Power Press, 2009.
    [4]
    宗伟林,许文强,原亚雷,等. 矿井配电网单相接地故障选线与定位新方法[J]. 工矿自动化,2016,42(11):45-50.

    ZONG Weilin,XU Wenqiang,YUAN Yalei,et al. A new type of single-phase grounding fault line selection and location method for mine distribution network[J]. Industry and Mine Automation,2016,42(11):45-50.
    [5]
    苏展,于绍峰,王洋. Z型联结组别接地变低压核相异常分析[J]. 变压器,2021,58(10):30-33.

    SU Zhan,YU Shaofeng,WANG Yang. Analysis of abnormal low-voltage phase check situation of Z-type grounding transformer[J]. Transformer,2021,58(10):30-33.
    [6]
    郭谋发,游建章,张伟骏,等. 基于三相级联H桥变流器的配电网接地故障分相柔性消弧方法[J]. 电工技术学报,2016,31(17):11-22. DOI: 10.3969/j.issn.1000-6753.2016.17.002

    GUO Moufa,YOU Jianzhang,ZHANG Weijun,et al. Separate-phase flexible arc-suppression method of earth-fault in distribution systems based on three-phase cascaded H-bridge converter[J]. Transactions of China Electrotechnical Society,2016,31(17):11-22. DOI: 10.3969/j.issn.1000-6753.2016.17.002
    [7]
    贠保记,马柯翔,司渭滨,等. 配电网单相接地故障的柔性熄弧装置[J]. 电力系统保护与控制,2021,49(19):124-134.

    YUN Baoji,MA Kexiang,SI Weibin,et al. Flexible arc extinguishing device for a single-phase ground fault in a distribution network[J]. Power System Protection and Control,2021,49(19):124-134.
    [8]
    曾祥君,卓超,喻锟,等. 基于接地变压器绕组分档调压干预的配电网主动降压消弧与保护新方法[J]. 中国电机工程学报,2020,40(5):1523-1534.

    ZENG Xiangjun,ZHUO Chao,YU Kun,et al. A novel method of faults arc extinguishing and feeder protection based on voltage regulating intervention with grounding transformer winding taps for distribution networks[J]. Proceedings of the CSEE,2020,40(5):1523-1534.
    [9]
    郭谋发,陈静洁,张伟骏,等. 基于单相级联H桥变流器的配电网故障消弧与选线新方法[J]. 电网技术,2015,39(9):2677-2684.

    GOU Moufa,CHEN Jingjie,ZHANG Weijun,et al. A novel approach for fault arc extinguishing and feeder selection in distribution networks based on single-phase cascade H-bridge converter[J]. Power System Technology,2015,39(9):2677-2684.
    [10]
    刘宝稳,马宏忠,沈培锋,等. 新型接地故障基波电流全补偿柔性控制系统[J]. 中国电机工程学报,2016,36(9):2322-2330.

    LIU Baowen,MA Hongzhong,SHEN Peifeng,et al. New flexible control system of full compensation single-phase ground fault fundamental current[J]. Proceedings of the CSEE,2016,36(9):2322-2330.
    [11]
    王崇林,刘建华. 三相五柱式消弧线圈及其自动跟踪补偿原理[J]. 中国矿业大学学报,1999,28(5):57-61.

    WANG Chonglin,LIU Jianhua. Arc suppression coil with three phases and five columns and its automatic compensation principle[J]. Journal of China University of Mining & Technology,1999,28(5):57-61.
    [12]
    曾祥君,胡京莹,王媛媛,等. 基于柔性接地技术的配电网三相不平衡过电压抑制方法[J]. 中国电机工程学报,2014,34(4):678-684.

    ZENG Xiangjun,HU Jingying,WANG Yuanyuan,et al. Suppressing method of three-phase unbalanced overvoltage based on distribution networks flexible grounding control[J]. Proceedings of the CSEE,2014,34(4):678-684.
    [13]
    蒋仁江,英云龙,秦志成,等. Z型接地变压器在PSCAD下的仿真模型构建[J]. 价值工程,2015,34(29):137-138.

    JIANG Renjiang,YING Yunlong,QIN Zhicheng,et al. Simulation model of zigzag grounding transformer by PSCAD[J]. Value Engineering,2015,34(29):137-138.
  • Related Articles

    [1]JIANG Sulong, GUO Pu, ZHAO Jiyun, MAN Jiaxiang, CAO Chao. Design and experimental study of electro-hydraulic buffer control valve for hydraulic support push cylinder[J]. Journal of Mine Automation, 2025, 51(2): 27-33. DOI: 10.13272/j.issn.1671-251x.2024120052
    [2]LIU Yang, XIA Mengjian. Intelligent liquid supply and drainage system in coal mine[J]. Journal of Mine Automation, 2022, 48(S2): 118-120,146.
    [3]ZHAO Rui. Design of automation device for durability test of manual reversing valve of hydraulic support[J]. Journal of Mine Automation, 2020, 46(4): 104-108. DOI: 10.13272/j.issn.1671-251x.2020010008
    [4]WANG Ranfeng, FU Xiang, ZHAO Yangsheng, HUANG Guangping. Research on stabilized pressure hydraulic fluid supply technology adapted to hydraulic support actio[J]. Journal of Mine Automation, 2018, 44(2): 32-38. DOI: 10.13272/j.issn.1671-251x.17289
    [5]WANG Fan, ZHAO Jiyu. Design of closed-loop control system for hydraulic cylinder position of roadway support[J]. Journal of Mine Automation, 2017, 43(10): 74-77. DOI: 10.13272/j.issn.1671-251x.2017.10.015
    [6]WU Laijie, LI Yafeng, CHEN Qi, LI Xuebin, LONG Qing. Design of internal measuring system of hydraulic cylinder stroke[J]. Journal of Mine Automation, 2015, 41(8): 116-119. DOI: 10.13272/j.issn.1671-251x.2015.08.029
    [7]HAO Tie-shua. Automatic Control System of Hydraulic Support Based on S7-300 PLC[J]. Journal of Mine Automation, 2010, 36(12): 78-80.
    [8]YANG Li-rong, CHENG Tie-dong. Design of Automatic Control System of Hydraulic and Conical Crusher with Single Cylinder Based on S7-200 PLC[J]. Journal of Mine Automation, 2009, 35(12): 95-97.
    [9]YANG Li-rong. Design of Fuzzy Control System for Single-cylinder Hydraulic Cone Crusher Based on PLC[J]. Journal of Mine Automation, 2009, 35(10): 117-118.
    [10]ZHANG Jing~(, 2). Design of Control System of Solid-liquid Pump Based on PLC[J]. Journal of Mine Automation, 2009, 35(4): 99-102.
  • Cited by

    Periodical cited type(10)

    1. 王生彪,郭明旭,何明伟. 沿空留巷工作面弧形三角区悬顶水力压裂治理技术研究. 中国煤炭. 2023(S2): 158-163 .
    2. 陈真,石蒙,杨征,谢永利,司建锋. 大采高工作面二次动压巷道水力压裂切顶卸压技术研究. 中国矿业. 2021(04): 134-139 .
    3. 张瑞,蔡青旺,黄炳香,陈树亮,金峰. 顾桥矿顶板水力压裂控制大巷变形技术研究. 煤炭工程. 2021(05): 45-50 .
    4. 张毅. 开元矿厚煤层开采水力压裂卸压技术研究. 矿业装备. 2021(03): 14-15 .
    5. 王建胜. 综采工作面坚硬顶板处理方式的选择. 西部探矿工程. 2021(12): 136-138+141 .
    6. 陈树亮,黄炳香,李丁,赵兴龙,徐杰,王常委. 煤岩体高压磨料水力割缝基本规律的试验研究. 采矿与岩层控制工程学报. 2020(04): 90-96 .
    7. 王杜虎. 水力压裂代替聚能管爆破预裂的可行性分析. 能源技术与管理. 2020(05): 58-60 .
    8. 张广杰,程志斌,丁坤朋. 定向水力压裂切顶卸压技术研究及应用. 山西冶金. 2020(05): 51-53+60 .
    9. 王浩鹏. 基于马兰矿坚硬顶板的水力压裂技术试验研究. 中国煤炭. 2020(11): 78-82 .
    10. 胡沛,赵寒. 胡家河矿临空掘进水力压裂切顶技术及应用. 内蒙古煤炭经济. 2020(18): 137-139 .

    Other cited types(2)

Catalog

    Article Metrics

    Article views (252) PDF downloads (24) Cited by(12)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return