ZHOU Kaiping. Research on combined positioning method of shearer onfully mechanized mining face of thin coal seam[J]. Journal of Mine Automation, 2019, 45(6): 52-57. DOI: 10.13272/j.issn.1671-251x.2019010096
Citation: ZHOU Kaiping. Research on combined positioning method of shearer onfully mechanized mining face of thin coal seam[J]. Journal of Mine Automation, 2019, 45(6): 52-57. DOI: 10.13272/j.issn.1671-251x.2019010096

Research on combined positioning method of shearer onfully mechanized mining face of thin coal seam

More Information
  • In order to solve problems of real-time positioning and automatic navigation of shearer, a combined positioning method of shearer on fully mechanized mining face of thin coal seam was proposed for difficulty of meeting requirements of rapid, real-time and accurate positioning of shearer by using a single positioning technology. An inertial navigation parameter calculation system composed of accelerometer and gyroscope is used to measure three-axis acceleration and triaxial angular velocity data of shearer. These data are collected by sensors and then transmitted to the explosion-proof computer set in the intake entry through a serial port. The attitude matrix is solved by mathematical calculation, and the collected information is converted to angular velocity and acceleration in the coordinate system through the attitude matrix. The navigation information of position, speed, attitude of the shearer were obtained by integral calculation. In order to reduce cumulative errors caused by inertial navigation, a precise geographic model of fully mechanized mining face was established, and a reference digital map of shearer's trajectory was formed. Map matching technology is used to further improve accuracy of shearer's autonomous positioning. The simulation results prove reliability of the method.
  • Related Articles

    [1]LIU Jing, WEI Zhiqiang, CAI Chunmeng, LIU Yang. Positioning method for roadheaders based on fusion of LiDAR and inertial navigation[J]. Journal of Mine Automation, 2025, 51(3): 78-85, 95. DOI: 10.13272/j.issn.1671-251x.2025010021
    [2]HE Jianwei. Research on the positioning method of continuous shearer in coal mines[J]. Journal of Mine Automation, 2021, 47(10): 42-48. DOI: 10.13272/j.issn.1671-251x.2020120011
    [3]YANG Lin, MA Hongwei, WANG Yan, WANG Chuanwei, ZHANG Zhenzhen. Research on method of simultaneous localization and mapping of coal mine inspection robot[J]. Journal of Mine Automation, 2019, 45(9): 18-24. DOI: 10.13272/j.issn.1671-251x.17444
    [4]TIAN Yuan. Inertial navigation positioning method of roadheader based on zero-velocity update[J]. Journal of Mine Automation, 2019, 45(8): 70-73. DOI: 10.13272/j.issn.1671-251x.2019010033
    [5]DU Jingyi, GUO Jinbao, ZHANG Bo. Inertial navigation and positioning system for underground driverless trai[J]. Journal of Mine Automation, 2018, 44(9): 5-9. DOI: 10.13272/j.issn.1671-251x.2018040022
    [6]ZHANG Shouxiang, LI Sen, SONG Lailiang. Positioning of coal mining equipments based on inertial navigation and odometer[J]. Journal of Mine Automation, 2018, 44(5): 52-57. DOI: 10.13272/j.issn.1671-251x.2018010042
    [7]JIANG Lei, YANG Liuming, WU Fangda, HAN Huijie, ZHOU Xue. Underground positioning method based on GMapping algorithm and fingerprint map constructio[J]. Journal of Mine Automation, 2017, 43(9): 96-101. DOI: 10.13272/j.issn.1671-251x.2017.09.017
    [8]TIAN Yuan. Present situation and development direction of navigation technology of boom-type roadheader[J]. Journal of Mine Automation, 2017, 43(8): 37-43. DOI: 10.13272/j.issn.1671-251x.2017.08.008
    [9]WANG Zhenghe. Trajectory generation algorithm of inertial navigation based on smart phone[J]. Journal of Mine Automation, 2015, 41(5): 87-90. DOI: 10.13272/j.issn.1671-251x.2015.05.021
    [10]LI Lu, MA Shao-yi. Construction of Mine-map Graph Correction System Based on MapX[J]. Journal of Mine Automation, 2009, 35(11): 115-116.
  • Cited by

    Periodical cited type(9)

    1. 曹建东. 煤矿综采工作面采煤机截割系统方案设计与应用. 机械管理开发. 2022(06): 227-228+231 .
    2. 宋单阳,杨金衡,陶心雅,卢春贵,田慕琴,宋建成. 基于非完整性约束的采煤机定位方法. 工矿自动化. 2022(07): 52-57 . 本站查看
    3. 武元军. 薄煤层综采工作面采煤机组合定位方法研究. 矿业装备. 2021(03): 216-217 .
    4. 杨金衡,宋单阳,田慕琴,宋建成,许春雨. 基于自适应卡尔曼滤波的双惯导采煤机定位方法. 工矿自动化. 2021(07): 14-20+28 . 本站查看
    5. 任广玉. 大采高智能化综采工作面设备配套工艺研究. 自动化应用. 2021(03): 122-123+127 .
    6. 任怀伟,赵国瑞,周杰,文治国,丁艳,李帅帅. 智能开采装备全位姿测量及虚拟仿真控制技术. 煤炭学报. 2020(03): 956-971 .
    7. 王守波. 综放工作面采煤工艺可靠性研究. 中国设备工程. 2020(13): 131-132 .
    8. 李帅帅,任怀伟. 综采工作面“三机”设备位姿测量技术研究现状与展望. 煤炭科学技术. 2020(09): 218-226 .
    9. 胡光军,廖洪波,兰利平,吴寻云. 极近距离极薄煤层软顶控制技术优化. 矿业工程研究. 2020(04): 6-12 .

    Other cited types(5)

Catalog

    Article Metrics

    Article views (114) PDF downloads (12) Cited by(14)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return