DUAN Qi, DING Hua, WANG Yiliang, DENG Jintao. Conceptual design system of three machines matching of fully mechanized coal mining equipment[J]. Journal of Mine Automation, 2018, 44(7): 11-16. DOI: 10.13272/j.issn.1671-251x.2018010023
Citation: DUAN Qi, DING Hua, WANG Yiliang, DENG Jintao. Conceptual design system of three machines matching of fully mechanized coal mining equipment[J]. Journal of Mine Automation, 2018, 44(7): 11-16. DOI: 10.13272/j.issn.1671-251x.2018010023

Conceptual design system of three machines matching of fully mechanized coal mining equipment

More Information
  • In view of problems that most of existing intelligent design methods of fully mechanized coal mining equipment are not considered complex coupling relationship among design parameters of three machines matching, which leading to poor applicability of the system and isolated design knowledge, a conceptual design method and matching principle of three machines of fully mechanized coal mining equipment based on knowledge reasoning were studied, the hybrid reasoning mechanism including case reasoning, rule reasoning and model reasoning was applied to the conceptual design of three machines matching of fully mechanized coal mining equipment, reasoning model of conceptual design of three machines matching of fully mechanized coal mining equipment based on the knowledge reasoning was established, conceptual design system of three machines matching of fully mechanized coal mining equipment based on knowledge reasoning was developed. The system uses knowledge reasoning method to do case reasoning of input initial parameters for user, and search similar case in the case database, so as to obtain satisfactory design scheme, if there is no similar case in the case database, parameter design of three machines matching was completed by model reasoning, so as to get parameter design scheme. The application example shows that the system has accurate design result and fast reasoning speed, which realizes intelligent design of fully mechanized coal mining equipment and shorten design cycle of products.
  • Related Articles

    [1]LUO Xiangyu, HUA Ying, WANG Xiping, XIE Panshi, WU Yongping. Review of construction and reasoning methods for knowledge graphs in coal mining domain[J]. Journal of Mine Automation, 2024, 50(11): 52-61. DOI: 10.13272/j.issn.1671-251x.2024090069
    [2]ZHANG Zhixing, FU Xiang, ZHANG Xiaoqiang, LI Haojie, QIN Yifan, LIU Meng, SUN Yan, JIA Yifan, YANG Yuqi. Automatic reasoning technology for coal mine industrial data AI models[J]. Journal of Mine Automation, 2024, 50(9): 138-143. DOI: 10.13272/j.issn.1671-251x.18181
    [3]WU Panxin, LIU Peng, SHU Ya, YU Qiankun, DING Enjie. Ontology construction and safety rule reasoning of main types of work in coal mine[J]. Journal of Mine Automation, 2022, 48(1): 64-70. DOI: 10.13272/j.issn.1671-251x.2021080053
    [4]CAO Xiangang, DUAN Xinyu, ZHANG Mengyuan, LEI Zhuo, LI Yanchuan. Coal mine equipment condition monitoring system desig[J]. Journal of Mine Automation, 2021, 47(5): 101-105. DOI: 10.13272/j.issn.1671-251x.2020120065
    [5]JIANG Shuijun, HU Min. Coal quality whole process management system desig[J]. Journal of Mine Automation, 2021, 47(4): 116-120. DOI: 10.13272/j.issn.1671-251x.2021010005
    [6]ZHANG Baolong, WANG Xiangqian, LI Huizong, HE Yerong. Research on construction and reasoning of coal mine accident case ontology knowledge base[J]. Journal of Mine Automation, 2018, 44(3): 35-41. DOI: 10.13272/j.issn.1671-251x.2017110017
    [7]BU Chuangli, PAN Lihu, ZHI Yu. Design of emergency plan management system of coal mine based on case-based reasoning[J]. Journal of Mine Automation, 2015, 41(7): 34-38. DOI: 10.13272/j.issn.1671-251x.2015.07.009
    [8]XU Bo, GUO Qiu-mi. Research of Audio Codec System Based on SPI Protocol and Its Desig[J]. Journal of Mine Automation, 2011, 37(1): 44-49.
    [9]WU Yun-xia, WU Xiao-hua, WANG Ying. Teaching Discussion of Course of C Language Program Desig[J]. Journal of Mine Automation, 2010, 36(5): 131-132.
    [10]ZHENG Liang, JIANG Da-ming, DAI Sheng-hua. Analysis of the Reliability of PLC and Its Redundancy Desig[J]. Journal of Mine Automation, 2005, 31(2): 58-59.
  • Cited by

    Periodical cited type(3)

    1. 陈华颖,杜志刚,宋兴家. 矿用综合调度管控平台设计. 工矿自动化. 2022(08): 122-126 . 本站查看
    2. 李小良,韩国庆,崔国生,郭志伟,杨雯喆. 基于多源多维联动功能的井下智能扩播平台的研究. 煤炭与化工. 2022(10): 71-73 .
    3. 王晓明. 船用自动化控制系统软件测试的设计研究. 舰船科学技术. 2020(02): 181-183 .

    Other cited types(2)

Catalog

    Article Metrics

    Article views (52) PDF downloads (14) Cited by(5)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return