WU Wei, TANG Lijun, TIAN Guozheng. Design of dispatching management system of mine-used locomotives[J]. Journal of Mine Automation, 2018, 44(7): 17-21. DOI: 10.13272/j.issn.1671-251x.2018010020
Citation: WU Wei, TANG Lijun, TIAN Guozheng. Design of dispatching management system of mine-used locomotives[J]. Journal of Mine Automation, 2018, 44(7): 17-21. DOI: 10.13272/j.issn.1671-251x.2018010020

Design of dispatching management system of mine-used locomotives

More Information
  • In view of problems of low efficiency of material transportation, safety hazards of potential safety of personnel and locomotive coexistence in incline roadway, and not fused linkage control system of winch existed in dispatching management system of vehicle, a novel dispatching management system of mine-used locomotives was designed. The dispatching management system includes three subsystems, namely accurate positioning system of locomotives, material management system of locomotives and linkage control system of winch. The accurate positioning system of locomotives uses wireless signal flight time positioning method to real-timely locate and track underground vehicle, and positioning accuracy is less than 1 m. The material management system of locomotives uses dynamic target recognizers and vehicle identification cards to manage materials of each locomotive, and can reduce material backlog. The linkage control system of winch uses dynamic target recognizer to monitor personnel going into the incline roadway, and can prevent from the personnel entering the incline roadway by monitoring operating state of the winch with mine-used breaker. With sharing data of each subsystem, management platform of the dispatching management system can realize general management for the locomotives. The practical application of the system shows that the system can make reasonable dispatching for track, supply situation and traffic safety of underground locomotives.
  • Related Articles

    [1]QU Shijia, YANG Huan. Research on mechanical response of artificial dam under gas explosion in roadway[J]. Journal of Mine Automation, 2023, 49(9): 132-139. DOI: 10.13272/j.issn.1671-251x.2023040078
    [2]HE Yang, LI Xiaohuo. Random vibration response analysis of longitudinal roadheader[J]. Journal of Mine Automation, 2018, 44(3): 87-91. DOI: 10.13272/j.issn.1671-251x.2017100038
    [3]LIU Yi. Positioning of underground mobile communication device based on three direction acceleration data[J]. Journal of Mine Automation, 2016, 42(4): 70-73. DOI: 10.13272/j.issn.1671-251x.2016.04.017
    [4]JI Xiaodong, XUE Guanghui, YANG Jianjian, WU Miao. Development of mine-used signal conditioning device of vibration acceleration sensor[J]. Journal of Mine Automation, 2014, 40(5): 106-108. DOI: 10.13272/j.issn.1671-251x.2014.05.028
    [5]LI Zhen, JIA Hong-gang, FAN Xu-feng. Load identification method of roadheader based on vibration acceleration signal and stress signal[J]. Journal of Mine Automation, 2013, 39(2): 6-9.
    [6]ZHANG Xu-li, CHEN Zheng-feng, ZHU Long-ji. Early-warning System of Belt Conveyor Based on Explosion-proof and Intrinsic Safety PLC[J]. Journal of Mine Automation, 2012, 38(4): 88-91.
    [7]WANG Yong-chao, SUN Huai-xiang. Application of Access and MCGS in Loading System of Main Shaft[J]. Journal of Mine Automation, 2010, 36(5): 94-97.
    [8]ZHOU Xin, MIAO Chang-yun, LI Yan-feng, WU Zhi-gang. Optimization of CS-ACELP Voice Code Algorithm and Its Implementation on DSP[J]. Journal of Mine Automation, 2009, 35(12): 69-72.
    [9]CAO Wen, SUN Wei, ZHAO Hui. Application Based on Ethernet of Microsoft Office Access in Query System of RSView Report Formas[J]. Journal of Mine Automation, 2007, 33(5): 123-124.

Catalog

    Article Metrics

    Article views (200) PDF downloads (19) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return