WANG Wanping, LI Shihao. Modeling and simulation of underground personnel safety evacuatio[J]. Journal of Mine Automation, 2016, 42(1): 20-23. DOI: 10.13272/j.issn.1671-251x.2016.01.007
Citation: WANG Wanping, LI Shihao. Modeling and simulation of underground personnel safety evacuatio[J]. Journal of Mine Automation, 2016, 42(1): 20-23. DOI: 10.13272/j.issn.1671-251x.2016.01.007

Modeling and simulation of underground personnel safety evacuatio

More Information
  • In view of problem of underground personnel safety evacuation when accident occurs, an underground personnel safety evacuation model was established. Underground tunnels are divided into grids, and distance between the grids and evacuation exit is reflected by setting members potential flow, so as to determine moving direction and evacuation route of evacuees. Evacuation time is obtained through combination of moving speed and response time of evacuees and detection time of disaster. The simulation results show that the model can directly present dynamic process of evacuation and provide data reference for safety evacuation scheme.
  • Related Articles

    [1]XU Xiangqian, JIAN Kuo, WANG Ning, LI Shengli. Cutting control of boom-type roadheader considering coal rock hardness[J]. Journal of Mine Automation, 2024, 50(4): 153-158. DOI: 10.13272/j.issn.1671-251x.18171
    [2]ZHANG Xuhui, SHI Shuo, YANG Hongqiang, YANG Wenjuan, ZHANG Chao, WANG Tian. Boom-type roadheader autonomous speed regulation cutting control system[J]. Journal of Mine Automation, 2023, 49(1): 80-89. DOI: 10.13272/j.issn.1671-251x.2022110066
    [3]WANG Zhongju, LI Xuanrui, WANG Jinfeng. Intelligent remote centralized control and cutting system for roadheader[J]. Journal of Mine Automation, 2022, 48(S1): 95-96.
    [4]ZHANG Chao, ZHANG Xuhui, ZHANG Kaixin, XIE Nan, ZHOU Chuang. Digital twin driven remote automatic cutting control technology of roadheader[J]. Journal of Mine Automation, 2020, 46(9): 15-20. DOI: 10.13272/j.issn.1671-251x.17640
    [5]FENG Junling, TIAN Muqin, HE Ying, WANG Xi. Simulation analysis on influencing factors of cutting head load of longitudinal roadheader[J]. Journal of Mine Automation, 2020, 46(5): 21-27. DOI: 10.13272/j.issn.1671-251x.2019090068
    [6]WANG Hong. Design of automatic control system of boom roadheader[J]. Journal of Mine Automation, 2016, 42(9): 68-71. DOI: 10.13272/j.issn.1671-251x.2016.09.016
    [7]TIAN Jie, WANG Hongyao, WU Miao. Dynamic characteristics analysis of automatic cutting and profiling control system for roadheader[J]. Journal of Mine Automation, 2015, 41(6): 40-44. DOI: 10.13272/j.issn.1671-251x.2015.06.010
    [8]SUN Zhao-yang, LI Xue-yi. Interchangeability Design of Cutting Arms of Cantilever Roadheader[J]. Journal of Mine Automation, 2012, 38(7): 55-58.
    [9]GAO Feng, WANG Su-yu, GAO Juan, LI Rui, WU Miao. Research of Automatic Control Method of Swing Speed of Cutting Arm of Roadheader[J]. Journal of Mine Automation, 2011, 37(8): 38-41.
    [10]SHI Xiu-bao, LU Mi-qi, CAO Zhi-juan. Simulation Research of Cutting Process of Cutting Head of Longitudinal-axial-roadheader Based on Matlab[J]. Journal of Mine Automation, 2010, 36(1): 37-39.

Catalog

    Article Metrics

    Article views (74) PDF downloads (10) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return