阳煤集团35kV线路接地故障的分析处理

Analysis and Processing of Grounding Fault of 35kV Lines in Yangquan Coal Group

  • 摘要: 分析了阳煤集团 35kV线路引发接地故障的原因 ,并采取加装电容的方法消除了接地故障

     

    Abstract: The paper analyses the cause of grounding fault of 35kV lines in Yangquan coal group, and gets rid of grounding fault by using the method of fixing capacitance.

     

/

返回文章
返回