卸煤线火车接近监控系统的设计与实现
Design of Train Closing Monitoring System on Coal Unloading Line and Its Implementatio
计量
- 文章访问数: 39
- HTML全文浏览量: 9
- PDF下载量: 0
引用本文: | 韩万祥, 刘丽, 吴开兴, 蒿社平. 卸煤线火车接近监控系统的设计与实现[J]. 工矿自动化, 2008, 34(3): 114-116. |
Citation: | HAN Wan-xiang, LIU Li, WU Kai-xing, HAO She-ping. Design of Train Closing Monitoring System on Coal Unloading Line and Its Implementatio[J]. Journal of Mine Automation, 2008, 34(3): 114-116. |