Abstract:
In view of problem that traditional methods is difficult to show coordinated development process of coalbed methane and coal, a new 3D dynamic simulation idea was proposed. The coordinated development model of coalbed methane and coal is demonstrated using technologies of 3D visualization and animation deduction. With "Jincheng Mode" as the background, based on the digital mine 3D platform MineSystem, key technologies of 3D integrated rapid modeling of up and down well, 3D visual dynamic editing for coordinated development, animation deduction of three-region linked 3D drainage are used to complete dynamic simulation of three-region linked coalbed methane development model of overall drainage up and down well. The 3D integrated display of the production planning area, development preparation area, and coal production area are realized, which provides technical support for the promotion and application of the coordinated development and utilization process of coalbed methane and coal.