煤矿全断面掘进机捷联惯导曲线测量系统

刘宇, 陈根林, 刘永忠

刘宇,陈根林,刘永忠.煤矿全断面掘进机捷联惯导曲线测量系统[J].工矿自动化,2019,45(8):65-69.. DOI: 10.13272/j.issn.1671-251x.2018120061
引用本文: 刘宇,陈根林,刘永忠.煤矿全断面掘进机捷联惯导曲线测量系统[J].工矿自动化,2019,45(8):65-69.. DOI: 10.13272/j.issn.1671-251x.2018120061
LIU Yu, CHEN Genlin, LIU Yongzhong. Strapdown inertial navigation curve measurement system of full-section roadheader in coal mine[J]. Journal of Mine Automation, 2019, 45(8): 65-69.. DOI: 10.13272/j.issn.1671-251x.2018120061
Citation: LIU Yu, CHEN Genlin, LIU Yongzhong. Strapdown inertial navigation curve measurement system of full-section roadheader in coal mine[J]. Journal of Mine Automation, 2019, 45(8): 65-69.. DOI: 10.13272/j.issn.1671-251x.2018120061

煤矿全断面掘进机捷联惯导曲线测量系统

基金项目: 

天地科技股份有限公司科技创新创业资金专项项目(2018-TD-QN033)

详细信息
  • 中图分类号: TD175

Strapdown inertial navigation curve measurement system of full-section roadheader in coal mine

  • 摘要: 针对现有煤矿掘进巷道偏差曲线测量系统存在不通视和实时测量难的问题,设计了一种煤矿全断面掘进机捷联惯导曲线测量系统。捷联惯导系统通过捷联姿态更新算法实时采集掘进机推进的姿态角;行程传感器安装于掘进机上,用于测量每次截割部向前推进的行程值;将姿态角和行程值代入巷道实际曲线算法得到实际的掘进曲线,与巷道设计轴线进行比较后得到掘进偏差曲线,根据偏差曲线及时对掘进巷道进行纠偏,以保证工程质量。实验结果表明,该系统可实现快速、实时的高精度曲线监控,能够准确计算测量出煤矿全断面掘进机前进的曲线偏差,掘进5 m时,最大偏差约为23.2 mm,满足煤矿掘进曲线精度要求。
    Abstract: In view of problems of bad visibility and difficulty in real-time measurement existed in deviation curve measurement system of coal mine tunneling roadway, a strapdown inertial navigation curve measurement system of full-section roadheader in coal mine was designed. The strapdown inertial navigation system uses strapdown attitude update algorithm to acquire attitude angle of the roadheader in real time.The travel sensor is installed on the roadheader and used to measure travel value pushed forward by each cutting section. The attitude angle and travel value were plug into the actual roadway curve algorithm to get the actual roadway tunneling curve, and tunneling deviation curve can be obtained by comparing with the design axis of roadway, the deviation of roadway tunneling is corrected in time according to the tunneling deviation curve, so as to ensure engineering quality. The experimental results show that the system can realize fast and real-time high-precision curve monitoring, and can accurately calculate and measure the curve deviation of full-section roadheader in coal mine. When the tunneling is 5 m, the maximum deviation is about 23.2 mm, which meets requirements of coal mine tunneling curve accuracy.
  • 期刊类型引用(7)

    1. 续江. 矿用全断面掘进机监控系统设计与实现. 江西煤炭科技. 2024(01): 184-186+189 . 百度学术
    2. 毛清华,周庆,安炎基,薛旭升,杨文娟. 惯导与视觉信息融合的掘进机精确定位方法. 煤炭科学技术. 2024(05): 236-248 . 百度学术
    3. 李志海,刘治翔,谢苗,李玉岐,王帅. 交替测量式掘进机定位系统误差建模与分析. 工矿自动化. 2022(01): 7-15+32 . 本站查看
    4. 燕利芳,尚秀全. 无人机测量技术在矿山地质测量工程中的应用研究. 能源与环保. 2022(09): 138-142+149 . 百度学术
    5. 王飞,谢进,罗伟,王立强. 煤矿掘进工作面智能化改造方案探讨. 陕西煤炭. 2021(04): 182-185 . 百度学术
    6. 石成虎,付良廷. 基于智能化综采工作面采煤机的惯导系统的设计与研究. 陕西煤炭. 2020(06): 27-31 . 百度学术
    7. 贺亚发. 掘进机自动化功能的升级设计与应用. 机械管理开发. 2020(12): 212-213+221 . 百度学术

    其他类型引用(4)

计量
  • 文章访问数:  53
  • HTML全文浏览量:  8
  • PDF下载量:  12
  • 被引次数: 11
出版历程
  • 刊出日期:  2019-08-19

目录

    /

    返回文章
    返回