Abstract:
For problems of hanging scaffold slant, full body stuck, winch rope rupture caused by manual operation of lifting device for vertical shaft construction according to experience and incomplete monitoring information at present, an implementation scheme of safety monitoring and control system of lifting device for vertical shaft construction was proposed, and compositions and key technologies were focused on. The system can realize functions of integrated control of lifting device for vertical shaft construction, main fault monitoring and protection and construction management.