基于选煤信息模型的智能化选煤厂三维可视化管理平台设计

郭庆华, 卫中宽, 张树森, 王然风

郭庆华,卫中宽,张树森,等. 基于选煤信息模型的智能化选煤厂三维可视化管理平台设计[J]. 工矿自动化,2022,48(11):54-62. DOI: 10.13272/j.issn.1671-251x.17936
引用本文: 郭庆华,卫中宽,张树森,等. 基于选煤信息模型的智能化选煤厂三维可视化管理平台设计[J]. 工矿自动化,2022,48(11):54-62. DOI: 10.13272/j.issn.1671-251x.17936
GUO Qinghua, WEI Zhongkuan, ZHANG Shusen, et al. Design of 3D visualization management platform for intelligent coal preparation plant based on coal preparation information model[J]. Journal of Mine Automation,2022,48(11):54-62. DOI: 10.13272/j.issn.1671-251x.17936
Citation: GUO Qinghua, WEI Zhongkuan, ZHANG Shusen, et al. Design of 3D visualization management platform for intelligent coal preparation plant based on coal preparation information model[J]. Journal of Mine Automation,2022,48(11):54-62. DOI: 10.13272/j.issn.1671-251x.17936

基于选煤信息模型的智能化选煤厂三维可视化管理平台设计

基金项目: 中国中煤能源集团有限公司重点科技项目(20201107)。
详细信息
    作者简介:

    郭庆华(1967—)男, 河北曲周人,教授级高级工程师,硕士,研究方向为煤矿智能化,E-mail:zf@cumtb.edu.cn

  • 中图分类号: TD948

Design of 3D visualization management platform for intelligent coal preparation plant based on coal preparation information model

  • 摘要: 目前选煤厂智能化建设中鲜有围绕设计、施工到生产运维全生命周期进行三维可视化管理的研究与开发,同时三维可视化和大数据云平台深度融合的研究也较少。针对上述问题,以建筑信息模型(BIM)为基础,针对BIM仅仅考虑选煤建(构)筑物信息模型,不能满足智能化选煤厂建设需求的问题,对其进行改进,提出了选煤信息模型(CPIM)。结合大数据云平台技术,设计了基于CPIM的智能化选煤厂三维可视化管理平台(该平台由基础设施层、数据源层、基础平台、应用层和业务展示层构成),构建了煤炭洗选工程数据标准,实现了选煤设计、施工、生产运维全生命周期的数据接入、治理、存储、分析、共享。重点分析了BIM轻量化引擎、CPIM大数据子平台构建、CPIM全生命周期应用、煤炭洗选工程数字化建设标准制定和软件系统自主研发与国产硬件适配等平台实现的关键技术。以中煤集团某选煤厂为研究对象,基于CPIM大数据子平台和BIM三维引擎子平台,构建了CPIM 全生命周期三维可视化应用平台,同时实现了硬件的国产化适配。现场应用表明:该平台可以对选煤厂设计、施工、运行各环节进行有效数据采集、统一加工、存储、分析和应用,打通了煤炭洗选行业的数据通道,实现了涵盖选煤厂设计、施工到生产运维全生命周期的三维可视化管理。
    Abstract: At present, in the intelligent construction of coal preparation plant, there is little research and development on 3D visualization management centering on the whole life cycle from design, construction to production and operation and maintenance. There is also little research on the deep integration of 3D visualization and big data cloud platform. In view of the above problems, based on the building information model (BIM), this paper improves it and puts forward coal preparation information model (CPIM). The proposed model aims at the problem that BIM only considers the information model of coal preparation buildings and structures. BIM can not meet the needs of intelligent coal preparation plant construction. Combined with the big data cloud platform technology, a 3D visualization management platform for intelligent coal preparation plant based on CPIM (the platform consists of infrastructure layer, data sources layer, basic platform, application layer and business display layer) is designed. The data standard of coal washing engineering is constructed. The data access, management, storage, analysis and sharing of the whole life cycle of coal preparation design, construction, production and operation and maintenance are realized. The key technologies of the platform implementation of BIM lightweight engine, CPIM big data sub-platform construction, CPIM whole life cycle application, standard formulation of digital construction of coal washing project and software system independent research and development and domestic hardware adaptation are analyzed. Taking a coal preparation plant of China Coal Group as the research object, based on CPIM big data sub-platform and BIM 3D engine sub-platform, the CPIM whole life cycle 3D visualization application platform is constructed. And the localization adaptation of hardware is realized. The field application shows that the platform can carry out effective data acquisition, unified processing, storage, analysis and application for the design, construction and operation of coal preparation plant. The platform opens up the data channel of the coal washing industry. The platform realizes the 3D visualization management covering the whole life cycle of coal preparation plant design, construction, and production operation and maintenance.
  • 图  1   基于CPIM的智能化选煤厂三维可视化管理平台整体架构

    Figure  1.   Overall architecture of 3D visualization management platform of intelligent coal preparation plant based on coal preparation information model

    图  2   煤炭洗选工程数字化建设标准体系

    Figure  2.   Digital construction standard system of coal washing project

    图  3   CPIM 全生命周期三维可视化应用平台架构

    Figure  3.   Architecture of whole life cycle 3D visualization application platform based on coal preparation information model

    图  4   煤炭洗选工程CPIM全生命周期三维可视化管理平台门户入口

    Figure  4.   Portal entrance of CPIM whole life cycle 3D visualization management platform for coal washing project

    图  5   选煤厂设计三维可视化管理界面

    Figure  5.   3D visualization management interface of coal preparation plant design

    图  6   选煤厂施工三维可视化管理界面

    Figure  6.   3D visualization management interface of coal preparation plant construction

    图  7   选煤生产运维可视化界面

    Figure  7.   Visualization interface of coal preparation production, operation and maintenance

  • [1] 陈小霞,郭莹,刘兆雪,等. 三维可视化信息管理系统在选煤生产中的应用[J]. 选煤技术,2022,50(2):95-100. DOI: 10.16447/j.cnki.cpt.2022.02.019

    CHEN Xiaoxia,GUO Ying,LIU Zhaoxue,et al. Application of 3-dimensional visualized information management system in coal cleaning operations[J]. Coal Preparation Technology,2022,50(2):95-100. DOI: 10.16447/j.cnki.cpt.2022.02.019

    [2] 申迎松,荣东. 数字孪生与三维可视化在天地王坡选煤厂的应用实践[J]. 煤炭加工与综合利用,2022(8):26-29. DOI: 10.16200/j.cnki.11-2627/td.2022.08.007

    SHEN Yingsong,RONG Dong. Application of digital hemitropism and 3D visualization in Tiandi Wangpo Coal Preparation Plant[J]. Coal Processing & Comprehensive Utilization,2022(8):26-29. DOI: 10.16200/j.cnki.11-2627/td.2022.08.007

    [3] 张帆,葛世荣,李闯. 智慧矿山数字孪生技术研究综述[J]. 煤炭科学技术,2020,48(7):168-176. DOI: 10.13199/j.cnki.cst.2020.07.017

    ZHANG Fan,GE Shirong,LI Chuang. Research summary on digital twin technology for smart mines[J]. Coal Science and Technology,2020,48(7):168-176. DOI: 10.13199/j.cnki.cst.2020.07.017

    [4] 任文华,鲍震,苟晓东,等. 骆驼山选煤厂智能化综合管控平台的设计与实现[J]. 工业控制计算机,2021,34(11):138-140. DOI: 10.3969/j.issn.1001-182X.2021.11.058

    REN Wenhua,BAO Zhen,GOU Xiaodong,et al. Intelligent comprehensive control platform for Luotuoshan Coal Preparation Plant[J]. Industrial Control Computer,2021,34(11):138-140. DOI: 10.3969/j.issn.1001-182X.2021.11.058

    [5] 邱加林. 三维协同设计技术BIM在选煤厂设计中的应用[J]. 科技创新与应用,2013(32):46.

    QIU Jialin. Application of three-dimensional collaborative design technology BIM in coal preparation plant design[J]. Technology Innovation and Application,2013(32):46.

    [6] 李太友. 三维协同设计技术BIM在选煤厂设计中的应用[J]. 煤炭工程,2013,45(3):133-135.

    LI Taiyou. 3D coordinated design technology BIM applied to design of coal preparation plant[J]. Coal Engineering,2013,45(3):133-135.

    [7] 林厦. BIM技术在选煤厂设计中的应用探讨[J]. 煤炭加工与综合利用,2019(3):29-32. DOI: 10.16200/j.cnki.11-2627/td.2019.3.007

    LIN Sha. Discussion of BIM technology application on coal preparation plant design[J]. Coal Processing & Comprehensive Utilization,2019(3):29-32. DOI: 10.16200/j.cnki.11-2627/td.2019.3.007

    [8] 孙再征. BIM技术在选煤厂设计中的应用[J]. 选煤技术,2020,48(3):70-73,77. DOI: 10.16447/j.cnki.cpt.2020.03.016

    SUN Zaizheng. Application of the building information management (BIM) technology in design of coal preparation plant[J]. Coal Preparation Technology,2020,48(3):70-73,77. DOI: 10.16447/j.cnki.cpt.2020.03.016

    [9] 潘伟. 基于大数据的智慧工厂制造优化技术研究[J]. 计算机技术与发展,2019,29(1):202-205. DOI: 10.3969/j.issn.1673-629X.2019.01.042

    PAN Wei. Research on manufacturing optimization of intelligent factory based on big data[J]. Computer Technology and Development,2019,29(1):202-205. DOI: 10.3969/j.issn.1673-629X.2019.01.042

    [10] 黄贺. BIM技术在大柳塔煤矿项目中的应用研究[J]. 煤炭工程,2016,48(12):22-24.

    HUANG He. Application research of BIM technology in Daliuta Coal Mine[J]. Coal Engineering,2016,48(12):22-24.

    [11]

    BECERIKGERBER B,JAZIZADEH F,LI Nan,et al. Application areas and data requirements for BIM-enabled facilities management[J]. Journal of Construction Engineering & Management,2011,138(3):431-442.

    [12]

    AHUJA R,SAWHNEY A,ARIF M. Prioritizing BIM capabilities of an organization:an interpretive structural modeling analysis[J]. Procedia Engineering,2017,196:2-10. DOI: 10.1016/j.proeng.2017.07.166

    [13]

    RAMAJI I J,MEMARI A M. Interpretation of structural analytical models from the coordination view in building information models[J]. Automation in Construction,2018,90:117-133. DOI: 10.1016/j.autcon.2018.02.025

    [14]

    MATEJKA P,KOSINA V,TOMEK A,et al. The integration of BIM in later project life cycle phases in unprepared environment from FM perspective[J]. Procedia Engineering,2016,164:550-557.

    [15]

    VALINEJADSHOUBI M,MOSELHI O,BAGCHI A. Integrating BIM into sensor-based facilities management operations[J]. Journal of Facilities Management,2021,20(3):385-400.

图(7)
计量
  • 文章访问数:  341
  • HTML全文浏览量:  72
  • PDF下载量:  72
  • 被引次数: 0
出版历程
  • 收稿日期:  2022-04-17
  • 修回日期:  2022-11-15
  • 网络出版日期:  2022-11-22
  • 刊出日期:  2022-11-24