Analysis on problems of construction of digital mine and its countermeasures
-
摘要: 分析了我国数字化矿山建设的现状及存在问题,并结合实际情况从转换管理方式、优化平台、建立专业级控制中心、加强大数据应用和管理、完善信息采集和展示方式几个方面提出了相应对策,为最终建立完整的可预测、预控、辅助矿方科学决策的可视化矿山平台,实现减人提效、人本安全提供参考。Abstract: Status quo and existing problems of construction of digital mine of China were analyzed, and corresponding countermeasures were put forward combined with actual situation from aspects of conversion of management method, platform optimization, building of professional control centers, strengthen of big data application and management, improvement of information collection and display ways. The paper provides reference for eventual establishment of a complete and predictable, pre-control, visualization platform which can assist scientific decision-making of coal mine, as well as achievement of less people and improved efficiency, and human security.
-
Key words:
- digital mine /
- management method /
- professional control center /
- big data /
- scientific decision-making
点击查看大图
计量
- 文章访问数: 72
- HTML全文浏览量: 10
- PDF下载量: 11
- 被引次数: 0