QIAO Bei-bei, JIANG Jun, MIAO Jin-kuang, et al. Application of Integrated Mine Automation System in Zhaogu No.1 Coal Mine[J]. Industry and Mine Automation, 2011, 37(5): 93-95.
Citation: QIAO Bei-bei, JIANG Jun, MIAO Jin-kuang, et al. Application of Integrated Mine Automation System in Zhaogu No.1 Coal Mine[J]. Industry and Mine Automation, 2011, 37(5): 93-95.

Application of Integrated Mine Automation System in Zhaogu No.1 Coal Mine

  • Publish Date: 2011-05-10
  • The paper introduced network structure of whole mine integrated automation system based on industrial Ethernet ring network and its application in Zhaogu No.1 Coal Mine, and analyzed problems in its application. The actual application showed that the establishment of integrated automation system greatly improves production automation and modernized management level of Zhaogu No.1 Coal Mine and realizes remote monitoring, unified management and data share of real-time data and running state of whole mine system.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (52) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return