ZHANG Guo-ying, YANG Hai-chun. Discussion on Application of WSN in Vehicle Scheduling System of Open-cut[J]. Industry and Mine Automation, 2010, 36(6): 31-34.
Citation: ZHANG Guo-ying, YANG Hai-chun. Discussion on Application of WSN in Vehicle Scheduling System of Open-cut[J]. Industry and Mine Automation, 2010, 36(6): 31-34.

Discussion on Application of WSN in Vehicle Scheduling System of Open-cut

  • For the problems of vehicle scheduling system of open-cut based on GPS,such as high energy consumption of user node,big volume and high cost and need fixed infrastructure, the paper discussed on feasibility of applying WSN in vehicle scheduling system of open-cut. It analyzed key technologies used in vehicle scheduling system of open-cut based on WSN, pointed out the positioning technology is a precondition of applying WSN in vehicle scheduling system of open-cut successfully, and introduced a positioning algorithm which is adapted to vehicle scheduling system of open-cut and implementation method of target positioning. Finally, it gave application prospect of the system.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (70) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return