LI Yan-min, ZHANG Yin-xia, LI Da-lei. Development of Equipment of Measuring Low Coal Level and Preventing Blockage of Coal Bunker[J]. Industry and Mine Automation, 2009, 35(1): 60-63.
Citation: LI Yan-min, ZHANG Yin-xia, LI Da-lei. Development of Equipment of Measuring Low Coal Level and Preventing Blockage of Coal Bunker[J]. Industry and Mine Automation, 2009, 35(1): 60-63.

Development of Equipment of Measuring Low Coal Level and Preventing Blockage of Coal Bunker

  • Publish Date: 2009-01-10
  • Aiming at two problems of measuring low coal level and(preventing) blockage of a temporary coal bunker of coal mine,the paper introduced a design of equipment of measuring low coal level and(preventing) blockage,which used hydraulic way to measure and control,and introduced installation,(structure) and working principle of the equipment in details.The actual application showed that the device had simple operation,stable running and reliable performance,and could resolve the problems of low coal level and blockage in a temporary coal bunker effectively with high application value.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (46) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return