The Automation Design of Underground Main Water-pumping in No.3 Jining Coal Mine
点击查看大图
计量
- 文章访问数: 44
- HTML全文浏览量: 6
- PDF下载量: 0
- 被引次数: 0
引用本文: | 潘忠, 陈桂兰. 济宁三号矿井井下主排水泵的自动化设计[J]. 工矿自动化, 2001, 27(4): 33-34. |
Citation: | PAN Zhong, CHEN Gui-la. The Automation Design of Underground Main Water-pumping in No.3 Jining Coal Mine[J]. Industry and Mine Automation, 2001, 27(4): 33-34. |