The Feasibility Analysis of Hoisting 7 Million in Main Mine of Xinglongzhuang Coal Mine and Its Reform Suggestions
点击查看大图
计量
- 文章访问数: 20
- HTML全文浏览量: 5
- PDF下载量: 0
- 被引次数: 0
引用本文: | 王衍博. 兴隆庄煤矿主井提升700万t可行性分析与改造建议[J]. 工矿自动化, 2001, 27(6): 16-18. |
Citation: | WANG Yan-bo. The Feasibility Analysis of Hoisting 7 Million in Main Mine of Xinglongzhuang Coal Mine and Its Reform Suggestions[J]. Industry and Mine Automation, 2001, 27(6): 16-18. |