New Model Integrated Control and Monitoring System Used in Coal Mine
SHI You-re
2001, 27(4): 1-3.
Abstract
Research On Permanent-magnet Motor with Running in Low-speed, Linear and Synchronous
SHANGGUANG Xuan-feng, LIU Chun-sheng, JIAO Liu-cheng
2001, 27(4): 3-6.
Abstract
Application of Direct-sequence Spread Spectrum Communication in Mobile Communication Used in Coal Mine
WU Ming-jie, XU Li-jie, ZHANG Ke
2001, 27(4): 6-8.
Abstract
The Arc-suppression Coil with Three-phases and Five-columns System and Its Application in Coal Mine Power Network
WANG Fu-xing , YAN Shi-hua
2001, 27(4): 9-11.
Abstract
Design Conception of Integrated Automation System for 110kV Substatio
FU Zhou-xing, GUO Ying-na, LI Zhong
2001, 27(4): 11-14.
Abstract
The Study of CAT Test Board for Motor
YANG Jing, SHI Lian-jun, LI Xin-ping, SHOU Long
2001, 27(4): 14-15.
Abstract
The Application and Analysis of the Braking Unit with Frequency converter for Electrical Haulage Shearer
HE Jing-de, HAN Bao-min, LIU Zhen-jian, RUI Guo-hong
2001, 27(4): 16-18.
Abstract
Research on the Geometric Error and Its Control Strategy and Implementation Method in Rapid Prototyping and Manufacturing
LI Zhan-li, GONG Shang-fu
2001, 27(4): 19-21.
Abstract
Implementation of Integrated Automation System for Coal Mine Substatio
Wang Qi-jun , Yang Feng-zhong , Chen Ying-xiang
2001, 27(4): 22-24.
Abstract
Detecting and Judging the Load on Spool Cylinder of Hoist Motor Used in Coal Mine Auxiliary Shaft
LIU Hong-li
2001, 27(4): 25-26.
Abstract
Feed Control for Jig
LI Hong-qing, QU Hao, LIU Jian-rong
2001, 27(4): 26-27.
Abstract
Applicaiton of Real-time Perspective Instrument for All-section of Core Wire Rope Transport Belt in Chengzhuang Coal Mine
FU Jun-qing
2001, 27(4): 28-29.
Abstract
Intelligent Vacuum Electromagnetic Starter Used in Coal Mine
TANG De-mao, HAN Qi-wei, ZHANG Zhong-yuan, ZHU Ren-you
2001, 27(4): 29-31.
Abstract
Development of RD-2000 Automatic Meter Reading System
REN Hui, LI Yong
2001, 27(4): 31-32.
Abstract
The Automation Design of Underground Main Water-pumping in No.3 Jining Coal Mine
PAN Zhong, CHEN Gui-la
2001, 27(4): 33-34.
Abstract
Operating and Hoisting Signal System for Auxiliary Shaft of Chaozhuang Coal Mine
WU Si-bo
2001, 27(4): 35-36.
Abstract
Improvement of Applying Technique of CO2 Automatic Welding
TENG Jin-long, YANG De-cai
2001, 27(4): 36-37.
Abstract
Implementation of Telecommunication of Control and Monitoring System for Belt Conveyor Used in Coal Mine
PAN Yu
2001, 27(4): 38-39.
Abstract
To Add Function of Loud-speaking to Dispatching Communication System
CHEN He-quan, WANG Jian-guo
2001, 27(4): 39-40.
Abstract
Design of Office Automation System Based on Web
QIAN Jian-sheng, LIU Fu-qiang, GU Jun, CHENG Le-tuan, CHANG Yu-lin, LIU Song-ke
2001, 27(4): 41-42.
Abstract
Treatment and Precautionary Measures for Common Faults of Main Station in Power Dispatching Automation System
ZHANG Wei
2001, 27(4): 43-44.
Abstract
Application of Single - chip Computer in Detecting Air Pressure
CHEN Wan-ping, KONG Xiang-he
2001, 27(4): 44-46.
Abstract
Design and Application of Control Circuit for Shearer Ends
JIN Jian-shun, XU Tai-shan, WANG Hong-qing, DONG Feng, WANG Ya-ping
2001, 27(4): 46-47.
Abstract
Practical Circuits of Anti-interference and Cutting off Protection Based on Single-chip Computer
ZHOU Li, LU Shi-kui
2001, 27(4): 48-49.
Abstract
Discussion on the Improvement of Three-phase Four-wire Power System
GAO Guo-mi
2001, 27(4): 50-50.
Abstract