column
The Research on Grasping of Automatic Synchronization Parallel Switch on Opportunity with Single-chip Microcomputer
FU Zhou-xing, LI Zhong, GUO Ying-na
2000, 26(6): 1-3.
Abstract
A Linear Bridge Circuit Based on PI Regulator
LI Ai-guo
2000, 26(6): 4-6.
Abstract
Study of Measuring Method for Metal Impact Ware
ZHAO Ya-wei , ZI Ke-ming , YANG Yan-bo
2000, 26(6): 6-8.
Abstract
Improved SDT Algorithm and Its Application in Process Data Compressio
WANG Zheng-hong
2000, 26(6): 9-11.
Abstract
Application of MATLAB Software in the Fuzzy Control System for Water Level in Boiler
CHEN Xin-hua
2000, 26(6): 12-14.
Abstract
How to Improve Reliability of Monitoring and Control System Based on SDT Engineering Computer
FANG Ming-huang , FANG Ming-ye
2000, 26(6): 15-17.
Abstract
Analysis of Electric-control System for Boom Tunnelling Machine and Study on its Reliability
WU Chong
2000, 26(6): 17-19.
Abstract
Study of Intelligent Multi-parameter Instruments Used in Mines
SUN Pei-de
2000, 26(6): 20-22.
Abstract
Development of Intelligent and Airtight Detecting Device
ZHAO Ji-yong
2000, 26(6): 22-24.
Abstract
The Fuzzy Control System for Electrodialysis
WANG Yu-bi
2000, 26(6): 25-26.
Abstract
Study of PLC Monitoring and Control System for Mine Used Switch Element
YANG Jin-zhong
2000, 26(6): 27-28.
Abstract
Anti-noise Broadcasting Telephone Communication System and Its Application in Coal Mine
ZHANG Bi-xia
2000, 26(6): 29-30.
Abstract
Application of Automation System for Electricity Dispatching in Huaibei Coal (Group )Co.,Ltd.
MIAO Xue-fu
2000, 26(6): 31-33.
Abstract
Selection Design and Application of Safety and Production Monitoring and Control System for Tucheng Coal Mine
SHE Jun, HU Shao-mei, YU Zhao-xing, HE Pei-qua
2000, 26(6): 33-34.
Abstract
Designing of Safety Information Management System Used in Coal Mine
SONG Jin-ling , WANG Hui , LIU Yu-ying , ZHANG Hong
2000, 26(6): 35-36.
Abstract
Model KJ56 Monitoring and Control System Used in Coal Mine
ZHOU Jian-chao, WANG Ai-bing
2000, 26(6): 37-38.
Abstract
Model KJ56 Monitoring and Control System Used in Coal Mine
ZHENG Feng-long , ZHENG Xiao-tian , SUN Yu-bao
2000, 26(6): 39-41.
Abstract
Research of the Application of Industry Controlling Configuration Based on Internet Technology in Coal Enterprise
YU Guo-fang, LI Ming, HUA Gang
2000, 26(6): 41-43.
Abstract
Development and Application of Read-write System for General IC Card
SHEN Lin, CHEN Zhi-feng, HU Ju
2000, 26(6): 44-45.
Abstract
Utilisation of Flame-proof Dieseal Rubber-tyred Geared Locomotive and Its Prospect
XU Ya-lei, YANG De-cai, ZHANG Nan-xin, LI Kai-sheng
2000, 26(6): 46-49.
Abstract
Geared Mould and Its Application Technology
LIU Jing-yan, SU Yao-qing, GUAN Xiao-qiang
2000, 26(6): 49-50.
Abstract